Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters
In this paper, probability distribution of demand during lead-time which is generalized Gamma four-parameters is considered in finding the optimal safety stock placement in cement manufacturing. The probability distribution of demand during lead-time is determined when the demand and the lead-time a...
保存先:
主要な著者: | , , |
---|---|
フォーマット: | 論文 |
出版事項: |
CESER Publications
2016
|
主題: | |
オンライン・アクセス: | http://repo.uum.edu.my/16859/ http://ceser.in/ceserp/index.php/ijamas/article/view/3940 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
id |
my.uum.repo.16859 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.168592016-04-26T07:57:40Z http://repo.uum.edu.my/16859/ Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters Ghafour, Karzan Mahdi Ramli, Razamin Zabidi, Nerda Zura QA Mathematics In this paper, probability distribution of demand during lead-time which is generalized Gamma four-parameters is considered in finding the optimal safety stock placement in cement manufacturing. The probability distribution of demand during lead-time is determined when the demand and the lead-time are probabilistic; each one is subject to different probability distribution function.The safety stock depends on the safety factor under certain service level and the standard deviation of demand during lead-time which can be obtained from the distribution.Finally, the quantities of the safety stock represent an optimal value at each position to avoid over or under stock which is the most controversial questions in the inventory system area. CESER Publications 2016 Article PeerReviewed Ghafour, Karzan Mahdi and Ramli, Razamin and Zabidi, Nerda Zura (2016) Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters. International Journal of Applied Mathematics and Statistics™ (IJAMAS), 54 (1). ISSN 0973-7545 http://ceser.in/ceserp/index.php/ijamas/article/view/3940 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
topic |
QA Mathematics |
spellingShingle |
QA Mathematics Ghafour, Karzan Mahdi Ramli, Razamin Zabidi, Nerda Zura Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
description |
In this paper, probability distribution of demand during lead-time which is generalized Gamma four-parameters is considered in finding the optimal safety stock placement in cement manufacturing. The probability distribution of demand during lead-time is determined when the demand and the lead-time are probabilistic; each one is subject to different probability distribution function.The safety stock depends on the safety factor under certain service level and the standard deviation of demand during lead-time which can be obtained from the distribution.Finally, the quantities of the safety stock represent an optimal value at each position to avoid over or under stock which is the most controversial questions in the inventory system area. |
format |
Article |
author |
Ghafour, Karzan Mahdi Ramli, Razamin Zabidi, Nerda Zura |
author_facet |
Ghafour, Karzan Mahdi Ramli, Razamin Zabidi, Nerda Zura |
author_sort |
Ghafour, Karzan Mahdi |
title |
Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
title_short |
Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
title_full |
Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
title_fullStr |
Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
title_full_unstemmed |
Optimizing safety stock in cement industry when the demand during lead-time distributed generalized Gamma fourparameters |
title_sort |
optimizing safety stock in cement industry when the demand during lead-time distributed generalized gamma fourparameters |
publisher |
CESER Publications |
publishDate |
2016 |
url |
http://repo.uum.edu.my/16859/ http://ceser.in/ceserp/index.php/ijamas/article/view/3940 |
_version_ |
1644282078751096832 |
score |
13.250246 |