Managing steam generator excess units at PT. YKL

Purpose - This paper is to apply lean principles to eliminate excess steam generators in the company.A multifunctional team which has a strong knowledge on process, simulation tools, and broad projects knowledge were involved. Methodology/Approach – PT. YKL has five steam stations for running its b...

Full description

Saved in:
Bibliographic Details
Main Author: Kurniawan, Made Yeri
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15968/1/P27.pdf
http://repo.uum.edu.my/15968/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.15968
record_format eprints
spelling my.uum.repo.159682016-04-18T01:46:42Z http://repo.uum.edu.my/15968/ Managing steam generator excess units at PT. YKL Kurniawan, Made Yeri HD28 Management. Industrial Management Purpose - This paper is to apply lean principles to eliminate excess steam generators in the company.A multifunctional team which has a strong knowledge on process, simulation tools, and broad projects knowledge were involved. Methodology/Approach – PT. YKL has five steam stations for running its business, extracting oil from its reservoir.The steam stations are home for 218 steam generators units. As its oil reservoirs mature, naturally the reservoirs require less steam.As the demand drops, PT.YKL needs to balance the supply. As a result, they have excess number of steam generators.They are initially identified it by collecting the unit’s allocation for maintenance and other shutdown issue per steam stations.This available-unit less maintenance-allocation shows the true steam generators supply capability.On the demand side, PT. YKL also looked at its demand forecast profile in the years to come.Defining the excess unit per steam station limits the number of excess unit they can eliminate.To maximize it, PT. YKL totally changed the way they defined the excess.By collecting all the excess in once steam station, they can maximize the number of excess.However, they need to ensure that the remaining steam generators can satisfy the customer’s requirements (in term of flow and pressure).Here simulation tools played its key role.Findings - It was found the implementation of this lean initiative was successfully decommissioned 46 excess steam generators from 218 steam generators.Research limitations / implications: The simulation tool could not exactly represent the actual key process parameters.Site tweaking was stil needed to adjust the key process parameters to achieve the expected performance measures.Value – Limiting the boundaries to define the number of steam generator excess reduce the number of excess unit PT.YKL can claim.By creatively enlarging the boundaries definition to beyond steam station level maximize the number of excess PT. YKL can claim.The project was successfully booked Total Accrued Financial Benefit is $ 5 MM. 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/15968/1/P27.pdf Kurniawan, Made Yeri (2014) Managing steam generator excess units at PT. YKL. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Kurniawan, Made Yeri
Managing steam generator excess units at PT. YKL
description Purpose - This paper is to apply lean principles to eliminate excess steam generators in the company.A multifunctional team which has a strong knowledge on process, simulation tools, and broad projects knowledge were involved. Methodology/Approach – PT. YKL has five steam stations for running its business, extracting oil from its reservoir.The steam stations are home for 218 steam generators units. As its oil reservoirs mature, naturally the reservoirs require less steam.As the demand drops, PT.YKL needs to balance the supply. As a result, they have excess number of steam generators.They are initially identified it by collecting the unit’s allocation for maintenance and other shutdown issue per steam stations.This available-unit less maintenance-allocation shows the true steam generators supply capability.On the demand side, PT. YKL also looked at its demand forecast profile in the years to come.Defining the excess unit per steam station limits the number of excess unit they can eliminate.To maximize it, PT. YKL totally changed the way they defined the excess.By collecting all the excess in once steam station, they can maximize the number of excess.However, they need to ensure that the remaining steam generators can satisfy the customer’s requirements (in term of flow and pressure).Here simulation tools played its key role.Findings - It was found the implementation of this lean initiative was successfully decommissioned 46 excess steam generators from 218 steam generators.Research limitations / implications: The simulation tool could not exactly represent the actual key process parameters.Site tweaking was stil needed to adjust the key process parameters to achieve the expected performance measures.Value – Limiting the boundaries to define the number of steam generator excess reduce the number of excess unit PT.YKL can claim.By creatively enlarging the boundaries definition to beyond steam station level maximize the number of excess PT. YKL can claim.The project was successfully booked Total Accrued Financial Benefit is $ 5 MM.
format Conference or Workshop Item
author Kurniawan, Made Yeri
author_facet Kurniawan, Made Yeri
author_sort Kurniawan, Made Yeri
title Managing steam generator excess units at PT. YKL
title_short Managing steam generator excess units at PT. YKL
title_full Managing steam generator excess units at PT. YKL
title_fullStr Managing steam generator excess units at PT. YKL
title_full_unstemmed Managing steam generator excess units at PT. YKL
title_sort managing steam generator excess units at pt. ykl
publishDate 2014
url http://repo.uum.edu.my/15968/1/P27.pdf
http://repo.uum.edu.my/15968/
http://stmlportal.net/ictom04/TOC.html
_version_ 1644281847463542784
score 13.212271