Kaizen-six sigma to improve pipeline project performance base on balance score card framework

Purpose: This paper presents an example of a Kaizen – Lean Sigma for improving pipeline project performance at Project Site ABC base on Balance Score Card Framework.Methodology: Kaizen is a Japanese philosophy that focuses on continual improvement throughout all aspects. Kaizen looks to improve all...

Full description

Saved in:
Bibliographic Details
Main Author: Amri, Hidayat Dwi
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15964/1/P31.pdf
http://repo.uum.edu.my/15964/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.15964
record_format eprints
spelling my.uum.repo.159642016-04-17T07:10:10Z http://repo.uum.edu.my/15964/ Kaizen-six sigma to improve pipeline project performance base on balance score card framework Amri, Hidayat Dwi HD28 Management. Industrial Management Purpose: This paper presents an example of a Kaizen – Lean Sigma for improving pipeline project performance at Project Site ABC base on Balance Score Card Framework.Methodology: Kaizen is a Japanese philosophy that focuses on continual improvement throughout all aspects. Kaizen looks to improve all aspects of a business through standardizing processes, increasing efficiency, and eliminating waste, include reworks in the process.Through Kaizen and Six Sigma, companies can make breakthrough improvements in existing processes.Six Sigma focuses more on improving the quality of the final product by finding and eliminating causes of defects, whether by variances in the business process or in manufacturing.Welding process takes important part for pipeline construction, and base on those approaches the defects on weld is decreased then thus to improve the project performance. Findings: The welding process in pipeline construction takes around 65% in the pipeline replacement project schedule and critical path for the project.From two previous segment, contractor have a reject welding ratio 14% and reject material 7%, so it will be reduce into less than 5% and 3%.The improvement process start from IPO diagram then the problem analyzed using fish bone. The improvement covered manpower skill, manpower certification, and procedure, and then resulted less rework and faster project.These improvements align with BSC Frame; Learning and innovation, Internal Process, Customer, and Financial. Research limitations/implications: This research focused on improvement of project performance on large diameter pipeline at site ABC, particularly on welding process. Future research work could consider variation on improved process, pipeline diameter, project site, and climate condition. Value: This paper presents an improvement in projects (Kaizen – Six Sigma) for pipeline replacement project that prove alignment the improvement process with BSC Framework for the company. 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/15964/1/P31.pdf Amri, Hidayat Dwi (2014) Kaizen-six sigma to improve pipeline project performance base on balance score card framework. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Amri, Hidayat Dwi
Kaizen-six sigma to improve pipeline project performance base on balance score card framework
description Purpose: This paper presents an example of a Kaizen – Lean Sigma for improving pipeline project performance at Project Site ABC base on Balance Score Card Framework.Methodology: Kaizen is a Japanese philosophy that focuses on continual improvement throughout all aspects. Kaizen looks to improve all aspects of a business through standardizing processes, increasing efficiency, and eliminating waste, include reworks in the process.Through Kaizen and Six Sigma, companies can make breakthrough improvements in existing processes.Six Sigma focuses more on improving the quality of the final product by finding and eliminating causes of defects, whether by variances in the business process or in manufacturing.Welding process takes important part for pipeline construction, and base on those approaches the defects on weld is decreased then thus to improve the project performance. Findings: The welding process in pipeline construction takes around 65% in the pipeline replacement project schedule and critical path for the project.From two previous segment, contractor have a reject welding ratio 14% and reject material 7%, so it will be reduce into less than 5% and 3%.The improvement process start from IPO diagram then the problem analyzed using fish bone. The improvement covered manpower skill, manpower certification, and procedure, and then resulted less rework and faster project.These improvements align with BSC Frame; Learning and innovation, Internal Process, Customer, and Financial. Research limitations/implications: This research focused on improvement of project performance on large diameter pipeline at site ABC, particularly on welding process. Future research work could consider variation on improved process, pipeline diameter, project site, and climate condition. Value: This paper presents an improvement in projects (Kaizen – Six Sigma) for pipeline replacement project that prove alignment the improvement process with BSC Framework for the company.
format Conference or Workshop Item
author Amri, Hidayat Dwi
author_facet Amri, Hidayat Dwi
author_sort Amri, Hidayat Dwi
title Kaizen-six sigma to improve pipeline project performance base on balance score card framework
title_short Kaizen-six sigma to improve pipeline project performance base on balance score card framework
title_full Kaizen-six sigma to improve pipeline project performance base on balance score card framework
title_fullStr Kaizen-six sigma to improve pipeline project performance base on balance score card framework
title_full_unstemmed Kaizen-six sigma to improve pipeline project performance base on balance score card framework
title_sort kaizen-six sigma to improve pipeline project performance base on balance score card framework
publishDate 2014
url http://repo.uum.edu.my/15964/1/P31.pdf
http://repo.uum.edu.my/15964/
http://stmlportal.net/ictom04/TOC.html
_version_ 1644281846581690368
score 13.214268