Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ

Merdeka Business Unit (MBU) is subsidiary of XYZ, Inc in Indonesia.As a global oil and gas company, XYZ, Inc had been implementing Lean Six Sigma since 1990s and cascaded down to its business units gradually.Since its first deployment in 2000, MBU Lean Sigma experienced steady if not unsatisfactory...

Full description

Saved in:
Bibliographic Details
Main Author: Kusnadi, Asana
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://repo.uum.edu.my/15956/1/P.pdf
http://repo.uum.edu.my/15956/
http://stmlportal.net/ictom04/TOC.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.15956
record_format eprints
spelling my.uum.repo.159562016-04-18T01:48:59Z http://repo.uum.edu.my/15956/ Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ Kusnadi, Asana HD28 Management. Industrial Management Merdeka Business Unit (MBU) is subsidiary of XYZ, Inc in Indonesia.As a global oil and gas company, XYZ, Inc had been implementing Lean Six Sigma since 1990s and cascaded down to its business units gradually.Since its first deployment in 2000, MBU Lean Sigma experienced steady if not unsatisfactory performance looking at the acrrued financial benefit (AFB) only. But with new leadership and governance, it’s AFB rose to MM $ 46 (6 times) compared to average AFB in the past eleven years in 2011, MM $ 206 (30 times) in 2012, and MM $ 392 (57 times) in 2013.Within three years, MBU successfully occupying the top position among other business unit in XYZ,inc on its AFB achievement. This paper presents the strategy in reinventing MBU Lean Six Sigma, its governance, best practices. XYZ’s five component model, will be tested with existing Critical Success Factor developed by Jeyaraman,K. and Teo, L.K (2010) based on manufacturing company practices LSS in Malaysia with more than 80% corresponding factors. Five component model will then be used to analyze MBU LSS implementation and its performance during the period of 2000-2010 and find the root causes. In addition, this paper will outline best practices to revamp LSS implementation in MBU and its Lean Six Sigma Success implementation Model 2014-08-18 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/15956/1/P.pdf Kusnadi, Asana (2014) Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia. http://stmlportal.net/ictom04/TOC.html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Kusnadi, Asana
Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
description Merdeka Business Unit (MBU) is subsidiary of XYZ, Inc in Indonesia.As a global oil and gas company, XYZ, Inc had been implementing Lean Six Sigma since 1990s and cascaded down to its business units gradually.Since its first deployment in 2000, MBU Lean Sigma experienced steady if not unsatisfactory performance looking at the acrrued financial benefit (AFB) only. But with new leadership and governance, it’s AFB rose to MM $ 46 (6 times) compared to average AFB in the past eleven years in 2011, MM $ 206 (30 times) in 2012, and MM $ 392 (57 times) in 2013.Within three years, MBU successfully occupying the top position among other business unit in XYZ,inc on its AFB achievement. This paper presents the strategy in reinventing MBU Lean Six Sigma, its governance, best practices. XYZ’s five component model, will be tested with existing Critical Success Factor developed by Jeyaraman,K. and Teo, L.K (2010) based on manufacturing company practices LSS in Malaysia with more than 80% corresponding factors. Five component model will then be used to analyze MBU LSS implementation and its performance during the period of 2000-2010 and find the root causes. In addition, this paper will outline best practices to revamp LSS implementation in MBU and its Lean Six Sigma Success implementation Model
format Conference or Workshop Item
author Kusnadi, Asana
author_facet Kusnadi, Asana
author_sort Kusnadi, Asana
title Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
title_short Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
title_full Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
title_fullStr Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
title_full_unstemmed Key success factor of lean six sigma implementation in oil and gas industry: Case study in MBU, strategic business unit of XYZ
title_sort key success factor of lean six sigma implementation in oil and gas industry: case study in mbu, strategic business unit of xyz
publishDate 2014
url http://repo.uum.edu.my/15956/1/P.pdf
http://repo.uum.edu.my/15956/
http://stmlportal.net/ictom04/TOC.html
_version_ 1644281844244414464
score 13.149126