Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project

The purpose of this research is to formulate and develop an ICT works interface strategy for construction-based project in construction industry.ICT works interface framework will be developed based on requirement engineering approach and work interface mapping.One of the major issues in delivery of...

Full description

Saved in:
Bibliographic Details
Main Authors: Md Taib, Mohd Azahani, Mohd Nawi, Mohd Nasrun, Omar, Mohd Faizal
Format: Article
Language:English
Published: AENSI Journals 2014
Subjects:
Online Access:http://repo.uum.edu.my/14754/1/13.pdf
http://repo.uum.edu.my/14754/
http://www.aensiweb.com/AEB/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.14754
record_format eprints
spelling my.uum.repo.147542016-04-18T02:36:11Z http://repo.uum.edu.my/14754/ Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project Md Taib, Mohd Azahani Mohd Nawi, Mohd Nasrun Omar, Mohd Faizal QA75 Electronic computers. Computer science The purpose of this research is to formulate and develop an ICT works interface strategy for construction-based project in construction industry.ICT works interface framework will be developed based on requirement engineering approach and work interface mapping.One of the major issues in delivery of ICT works is unavailability of ICT interface strategy and methodology to be referred by ICT contractors or system integrators involved in construction-based project.The problem arise when interfacing processes are not well understood and coordinated properly especially in large scale construction project which has complex tasks of engineering integration.This research is an “action research” where the root of problem is originated from the workplace area of the researcher.This research will identify the common practice of work integration between ICT and engineering, interfacing processes and type of ICT works involved in a construction-based project experienced and managed by KLIA Consultancy Services Sdn Bhd (KLIACS).Qualitative method will be applied where two case studies will be conducted in order to gain information of ICT plan and method used during the project implementation. The expected result of this research would be the creation of an ICT work interface strategy which able to provide interface planning and framework for delivering ICT works involved in construction-based project.It is anticipated that the result would be able to contribute to the improvement of the ICT works interface and project integration as well as the enhancement of the project quality management system of KLIACS.It would also become part of references for the company to manage ICT works for its entire construction-based project. The result is also expected to benefit the government, ICT players AENSI Journals 2014 Article PeerReviewed application/pdf en cc4_by http://repo.uum.edu.my/14754/1/13.pdf Md Taib, Mohd Azahani and Mohd Nawi, Mohd Nasrun and Omar, Mohd Faizal (2014) Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project. Advances in Environmental Biology, 8 (22). pp. 46-48. ISSN 1995 - 0756 http://www.aensiweb.com/AEB/
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic QA75 Electronic computers. Computer science
spellingShingle QA75 Electronic computers. Computer science
Md Taib, Mohd Azahani
Mohd Nawi, Mohd Nasrun
Omar, Mohd Faizal
Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
description The purpose of this research is to formulate and develop an ICT works interface strategy for construction-based project in construction industry.ICT works interface framework will be developed based on requirement engineering approach and work interface mapping.One of the major issues in delivery of ICT works is unavailability of ICT interface strategy and methodology to be referred by ICT contractors or system integrators involved in construction-based project.The problem arise when interfacing processes are not well understood and coordinated properly especially in large scale construction project which has complex tasks of engineering integration.This research is an “action research” where the root of problem is originated from the workplace area of the researcher.This research will identify the common practice of work integration between ICT and engineering, interfacing processes and type of ICT works involved in a construction-based project experienced and managed by KLIA Consultancy Services Sdn Bhd (KLIACS).Qualitative method will be applied where two case studies will be conducted in order to gain information of ICT plan and method used during the project implementation. The expected result of this research would be the creation of an ICT work interface strategy which able to provide interface planning and framework for delivering ICT works involved in construction-based project.It is anticipated that the result would be able to contribute to the improvement of the ICT works interface and project integration as well as the enhancement of the project quality management system of KLIACS.It would also become part of references for the company to manage ICT works for its entire construction-based project. The result is also expected to benefit the government, ICT players
format Article
author Md Taib, Mohd Azahani
Mohd Nawi, Mohd Nasrun
Omar, Mohd Faizal
author_facet Md Taib, Mohd Azahani
Mohd Nawi, Mohd Nasrun
Omar, Mohd Faizal
author_sort Md Taib, Mohd Azahani
title Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
title_short Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
title_full Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
title_fullStr Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
title_full_unstemmed Proposed study of Information Communication Technology (ICT) works interface strategy for construction-based project
title_sort proposed study of information communication technology (ict) works interface strategy for construction-based project
publisher AENSI Journals
publishDate 2014
url http://repo.uum.edu.my/14754/1/13.pdf
http://repo.uum.edu.my/14754/
http://www.aensiweb.com/AEB/
_version_ 1644281538382135296
score 13.18916