Internal control system deficiency and capital project mis-management in the Nigerian public sector

The aim of this study is to analyse the effects of internal control system deficiency on capital project management in the Nigerian public sector.A sample of two hundred and twenty eight capital projects (228) was used.Kendall’s tau_ b τ, ANOVA and Chi-square X2 statistics were employed for analysin...

Full description

Saved in:
Bibliographic Details
Main Authors: Babatunde, Shakirat Adepeju, Dandago, Kabiru Isa
Format: Conference or Workshop Item
Language:English
Published: Elsevier Ltd. 2014
Subjects:
Online Access:http://repo.uum.edu.my/13380/1/28.pdf
http://repo.uum.edu.my/13380/
http://dx.doi.org/10.1016/j.sbspro.2014.11.069
Tags: Add Tag
No Tags, Be the first to tag this record!