Flexibility supply chain in Industrialised Building System (IBS)

It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves.In Malaysia this technologically enhanced method is known as the industrialised Building System (IBS).Concerted efforts have been ma...

Full description

Saved in:
Bibliographic Details
Main Authors: Kassim, Umar, Abdullah, S., Mohamed Udin, Zulkifli
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:http://repo.uum.edu.my/11740/1/Ka.pdf
http://repo.uum.edu.my/11740/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.11740
record_format eprints
spelling my.uum.repo.117402016-04-18T05:54:17Z http://repo.uum.edu.my/11740/ Flexibility supply chain in Industrialised Building System (IBS) Kassim, Umar Abdullah, S. Mohamed Udin, Zulkifli TH Building construction It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves.In Malaysia this technologically enhanced method is known as the industrialised Building System (IBS).Concerted efforts have been made for the past decade by various responsible parties especially by the government. Therefore, the IBS 'Road Map' 2003-2010 was introduced and now continues with the IBS 'road map' 2011-2015.However, its performance is still at its infancy, which target is only at an initial stage This study seeks to identify and analyse the factor of the IBS' system's supply chain flexibility as a factor on the success of the system itself.It has been a suspicion that there exists a condition and situation where the supply chain is too rigid and is not flexible in fulfilling the needs and demands of the IBS development in Malaysia.This inflexible situation has brought about a broad range of problems and has stood in the way of the development of the industrialised building system, despite it being introduced since 1964. or 49 years ago. Flexibility in the IBS supply chain is very important and is associated with other industries like transportation, manufacturing industry, and others.Up until now, we have yet to disco~er any special studies related to the flexibility in the IBS supply chain in this country.Responding to this challenge, this research is hoped to be able to probide sufficient feedback to the solution to the IBS supply chain flexibility issue.The researcher is confident that the poor system flow of supply chain has impeded the advancement of the Industrialised Building System that has long been open to debate. 2013-11-21 Conference or Workshop Item NonPeerReviewed application/pdf en http://repo.uum.edu.my/11740/1/Ka.pdf Kassim, Umar and Abdullah, S. and Mohamed Udin, Zulkifli (2013) Flexibility supply chain in Industrialised Building System (IBS). In: 3rd International Building Control Conference (IBCC), 21st November 2013, Royal Chulan Hotel, Kuala Lumpur, Malaysia. (Unpublished)
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Kassim, Umar
Abdullah, S.
Mohamed Udin, Zulkifli
Flexibility supply chain in Industrialised Building System (IBS)
description It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves.In Malaysia this technologically enhanced method is known as the industrialised Building System (IBS).Concerted efforts have been made for the past decade by various responsible parties especially by the government. Therefore, the IBS 'Road Map' 2003-2010 was introduced and now continues with the IBS 'road map' 2011-2015.However, its performance is still at its infancy, which target is only at an initial stage This study seeks to identify and analyse the factor of the IBS' system's supply chain flexibility as a factor on the success of the system itself.It has been a suspicion that there exists a condition and situation where the supply chain is too rigid and is not flexible in fulfilling the needs and demands of the IBS development in Malaysia.This inflexible situation has brought about a broad range of problems and has stood in the way of the development of the industrialised building system, despite it being introduced since 1964. or 49 years ago. Flexibility in the IBS supply chain is very important and is associated with other industries like transportation, manufacturing industry, and others.Up until now, we have yet to disco~er any special studies related to the flexibility in the IBS supply chain in this country.Responding to this challenge, this research is hoped to be able to probide sufficient feedback to the solution to the IBS supply chain flexibility issue.The researcher is confident that the poor system flow of supply chain has impeded the advancement of the Industrialised Building System that has long been open to debate.
format Conference or Workshop Item
author Kassim, Umar
Abdullah, S.
Mohamed Udin, Zulkifli
author_facet Kassim, Umar
Abdullah, S.
Mohamed Udin, Zulkifli
author_sort Kassim, Umar
title Flexibility supply chain in Industrialised Building System (IBS)
title_short Flexibility supply chain in Industrialised Building System (IBS)
title_full Flexibility supply chain in Industrialised Building System (IBS)
title_fullStr Flexibility supply chain in Industrialised Building System (IBS)
title_full_unstemmed Flexibility supply chain in Industrialised Building System (IBS)
title_sort flexibility supply chain in industrialised building system (ibs)
publishDate 2013
url http://repo.uum.edu.my/11740/1/Ka.pdf
http://repo.uum.edu.my/11740/
_version_ 1644280724588593152
score 13.18916