Cause and effect of delay in construction project: A case study of road construction project in Malaysia

Construction delay is one of the biggest challenges that faced by construction industries.There are various causes responsible for the delay in construction project that require serious attention to understand and address in order to achieve successful in complete the project on time....

Full description

Saved in:
Bibliographic Details
Main Authors: Tan, Chun Keong, Yong, Wan Thing, Ooi, Chung Pang, Mohd Nawi, Mohd Nasrun, Osman, Wan Nadzri
Format: Conference or Workshop Item
Language:English
Published: 2013
Subjects:
Online Access:http://repo.uum.edu.my/11679/1/p320.pdf
http://repo.uum.edu.my/11679/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.11679
record_format eprints
spelling my.uum.repo.116792014-08-18T07:09:46Z http://repo.uum.edu.my/11679/ Cause and effect of delay in construction project: A case study of road construction project in Malaysia Tan, Chun Keong Yong, Wan Thing Ooi, Chung Pang Mohd Nawi, Mohd Nasrun Osman, Wan Nadzri TE Highway engineering. Roads and pavements Construction delay is one of the biggest challenges that faced by construction industries.There are various causes responsible for the delay in construction project that require serious attention to understand and address in order to achieve successful in complete the project on time. Delays are source of potential risks that may lead to many negatives impact such as increased cost, decrease of productivity and revenue, lawsuits between owners and contractors, and contracts termination. Therefore, there are many current studies are looking way into it to eradicating or minimising them. This study was carried out based on literature review.The purpose of this study is to investigate the causes and effects of delay in construction project.Case studies on a specifics road construction project were develop as a tool to discover the cause and effect of the delay in construction project. In this research we will mainly discussed the 10 importance causes of delay and 5 importance effect that cause by delay in road construction project.At the end, there will be some recommendation and suggestion of possible way of managing or minimising the construction delay problems. 2013-05-14 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/11679/1/p320.pdf Tan, Chun Keong and Yong, Wan Thing and Ooi, Chung Pang and Mohd Nawi, Mohd Nasrun and Osman, Wan Nadzri (2013) Cause and effect of delay in construction project: A case study of road construction project in Malaysia. In: Simposium Pengurusan Teknologi, Operasi & Logistik (SIPTIK IV), 14-16 Mei 2013, Foyer Perpustakaan Sultanah Bahiyah UUM.
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TE Highway engineering. Roads and pavements
spellingShingle TE Highway engineering. Roads and pavements
Tan, Chun Keong
Yong, Wan Thing
Ooi, Chung Pang
Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
Cause and effect of delay in construction project: A case study of road construction project in Malaysia
description Construction delay is one of the biggest challenges that faced by construction industries.There are various causes responsible for the delay in construction project that require serious attention to understand and address in order to achieve successful in complete the project on time. Delays are source of potential risks that may lead to many negatives impact such as increased cost, decrease of productivity and revenue, lawsuits between owners and contractors, and contracts termination. Therefore, there are many current studies are looking way into it to eradicating or minimising them. This study was carried out based on literature review.The purpose of this study is to investigate the causes and effects of delay in construction project.Case studies on a specifics road construction project were develop as a tool to discover the cause and effect of the delay in construction project. In this research we will mainly discussed the 10 importance causes of delay and 5 importance effect that cause by delay in road construction project.At the end, there will be some recommendation and suggestion of possible way of managing or minimising the construction delay problems.
format Conference or Workshop Item
author Tan, Chun Keong
Yong, Wan Thing
Ooi, Chung Pang
Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
author_facet Tan, Chun Keong
Yong, Wan Thing
Ooi, Chung Pang
Mohd Nawi, Mohd Nasrun
Osman, Wan Nadzri
author_sort Tan, Chun Keong
title Cause and effect of delay in construction project: A case study of road construction project in Malaysia
title_short Cause and effect of delay in construction project: A case study of road construction project in Malaysia
title_full Cause and effect of delay in construction project: A case study of road construction project in Malaysia
title_fullStr Cause and effect of delay in construction project: A case study of road construction project in Malaysia
title_full_unstemmed Cause and effect of delay in construction project: A case study of road construction project in Malaysia
title_sort cause and effect of delay in construction project: a case study of road construction project in malaysia
publishDate 2013
url http://repo.uum.edu.my/11679/1/p320.pdf
http://repo.uum.edu.my/11679/
_version_ 1644280707016556544
score 13.149126