Validating site selection criteria for precast manufacturing plant in Malaysia

The Malaysian Government has endorsed the usage of Industrialised Building System (IBS) in domestic projects none of the studies have contributed to the location decision for precast manufacturing plant which required proper location to improve the local economic activity development.The study in th...

Full description

Saved in:
Bibliographic Details
Main Authors: Azman, Mohamed Nor Azhari, Mohd Nawi, Mohd Nasrun, S. Ahamad, Mohd Sanusi, Kiong, Tee Tze
Format: Article
Language:English
Published: AENSI 2014
Subjects:
Online Access:http://repo.uum.edu.my/10989/1/Fulpaper%20Nasrun%20AJBAS%202014_462-468.pdf
http://repo.uum.edu.my/10989/
http://www.ajbasweb.com/
Tags: Add Tag
No Tags, Be the first to tag this record!