A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
Due to the combination of problems and issues that arose in the current construction industry such as fragmentation, less of productivity and quality, lack of sustainability etc, the Malaysian Government proposed a new solution through industrialisation technology called lndustrialised Building Sys...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi |
---|---|
Format: | Article |
Language: | English |
Published: |
Construction Research Institute of Malaysia
2011
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/10231/1/4.pdf http://repo.uum.edu.my/10231/ http://www.cream.my/about-mcrj/download-mcrj.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
Published: (2014) -
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2011) -
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)