A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry

IBS has been introduced since 1960, and since then, there are many advantages that can be seen from the implementation of IBS in Malaysia. Although construction player already knows the advantages of IBS, but at the same time, implementation of IBS in Malaysia is still in low phase. Based on literat...

Full description

Saved in:
Bibliographic Details
Main Author: Norhidayah, Tamrin
Format: Thesis
Language:English
English
English
Published: 2018
Subjects:
Online Access:https://etd.uum.edu.my/9999/1/s816553_01.pdf
https://etd.uum.edu.my/9999/2/s816553_02.pdf
https://etd.uum.edu.my/9999/3/s816553_reference.docx
https://etd.uum.edu.my/9999/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.etd.9999
record_format eprints
spelling my.uum.etd.99992022-10-27T01:08:56Z https://etd.uum.edu.my/9999/ A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry Norhidayah, Tamrin HD28-70 Management. Industrial Management TH Building construction IBS has been introduced since 1960, and since then, there are many advantages that can be seen from the implementation of IBS in Malaysia. Although construction player already knows the advantages of IBS, but at the same time, implementation of IBS in Malaysia is still in low phase. Based on literature review, there are several obstacles to IBS implementation which are awareness, cost issues, readiness, planning & implementation, negative perception incentive, directive & promotion, knowledge and project delivery and supply chain. Readiness is one of the obstacles of IBS implementation and there is limited study of readiness factors for implementing IBS at present. This highlights the need of research in deep on the readiness in order to increase the implementation of IBS in Malaysia Construction Industry. This research aims to explore the key factors of readiness that influence the IBS implementation and develop a readiness framework towards transformation from conventional methods to IBS. This research used qualitative approach for research method and interviews for research technique. Multidisciplinary Malaysian IBS expert experience in IBS was used to get more information of the IBS in the current practice, which is involved four respondents for data collection and four others respondent for framework validation. Finding from data interview and literature review, there are three key factors that influence readiness in the implementation of IBS. The key factors are suitability, knowledge and ability. From these three key factors, frameworks are formed for more understandable. Other than that, the output can also be used as a guideline for construction players towards the betterment of IBS implementation by introducing the factors that should be emphasized to make sure they ready to implement IBS and get advantages from it. 2018 Thesis NonPeerReviewed text en https://etd.uum.edu.my/9999/1/s816553_01.pdf text en https://etd.uum.edu.my/9999/2/s816553_02.pdf text en https://etd.uum.edu.my/9999/3/s816553_reference.docx Norhidayah, Tamrin (2018) A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry. Masters thesis, Universiti Utara Malaysia.
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
url_provider http://etd.uum.edu.my/
language English
English
English
topic HD28-70 Management. Industrial Management
TH Building construction
spellingShingle HD28-70 Management. Industrial Management
TH Building construction
Norhidayah, Tamrin
A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
description IBS has been introduced since 1960, and since then, there are many advantages that can be seen from the implementation of IBS in Malaysia. Although construction player already knows the advantages of IBS, but at the same time, implementation of IBS in Malaysia is still in low phase. Based on literature review, there are several obstacles to IBS implementation which are awareness, cost issues, readiness, planning & implementation, negative perception incentive, directive & promotion, knowledge and project delivery and supply chain. Readiness is one of the obstacles of IBS implementation and there is limited study of readiness factors for implementing IBS at present. This highlights the need of research in deep on the readiness in order to increase the implementation of IBS in Malaysia Construction Industry. This research aims to explore the key factors of readiness that influence the IBS implementation and develop a readiness framework towards transformation from conventional methods to IBS. This research used qualitative approach for research method and interviews for research technique. Multidisciplinary Malaysian IBS expert experience in IBS was used to get more information of the IBS in the current practice, which is involved four respondents for data collection and four others respondent for framework validation. Finding from data interview and literature review, there are three key factors that influence readiness in the implementation of IBS. The key factors are suitability, knowledge and ability. From these three key factors, frameworks are formed for more understandable. Other than that, the output can also be used as a guideline for construction players towards the betterment of IBS implementation by introducing the factors that should be emphasized to make sure they ready to implement IBS and get advantages from it.
format Thesis
author Norhidayah, Tamrin
author_facet Norhidayah, Tamrin
author_sort Norhidayah, Tamrin
title A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
title_short A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
title_full A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
title_fullStr A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
title_full_unstemmed A readiness framework in implementation of industrialised building system (IBS) in Malaysian construction industry
title_sort readiness framework in implementation of industrialised building system (ibs) in malaysian construction industry
publishDate 2018
url https://etd.uum.edu.my/9999/1/s816553_01.pdf
https://etd.uum.edu.my/9999/2/s816553_02.pdf
https://etd.uum.edu.my/9999/3/s816553_reference.docx
https://etd.uum.edu.my/9999/
_version_ 1748183203431055360
score 13.149126