Improving project disbursement process in a Malaysian shipyard
This study is about the deployment of Business Process Reengineering (BPR) in a Shipyard to resolve the problem of the project disbursement process that has caused a significant delay in approving a statement of work progress (SOP). A revamping effort to reduce the SOP approval cycle time and gain a...
Saved in:
Main Author: | Azman, Ismail |
---|---|
Format: | Thesis |
Language: | English English |
Published: |
2018
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/7926/1/Depositpermission_s95119.pdf https://etd.uum.edu.my/7926/2/s95119_01.pdf https://etd.uum.edu.my/7926/ https://sierra.uum.edu.my/record=b1698960~S1 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of accuracy control system in Batam shipyard
by: Andalas, Ronny
Published: (2005) -
Hydraulic investigation of channel under tidal influence
by: Ismail, Tarmizi, et al.
Published: (2006) -
Hydroelastic and hydrodynamic analysis of a uniform rigid and flexible barge using weakly compressible smoothed particle hydrodynamics (WCSPH)
by: Ramli, Muhammad Zahir, et al.
Published: (2018) -
The hydrodynamic coefficients for an oscillating 2D rectangular box using weakly compressible smoothed particle hydrodynamics (WCSPH) method
by: Ramli, Muhammad Zahir
Published: (2018) -
Hydrodynamic coefficients for a 3-D uniform flexible barge using weakly compressible smoothed particle hydrodynamics :Keynote contribution for the international Workshop on Wave Loads and Motions of Ships
and Offshore Structures, Harbin, China, 5-7 November, 2017
by: Ramli, Muhammad Zahir, et al.
Published: (2018)