Development of an information and communication technology works interface framework for large scale construction-based project

This research aims to develop an Information and Communication Technology (ICT) Works Interface Framework for large scale construction-based project in construction industry. Based on KLIA Consultancy Services Sdn Bhd’s (KLIACS) experiences in managing several large scale construction projects, inte...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Azahani, Md Taib
Format: Thesis
Language:English
English
Published: 2018
Subjects:
Online Access:https://etd.uum.edu.my/7837/1/Depositpermission_s95699.pdf
https://etd.uum.edu.my/7837/2/s95699_01.pdf
https://etd.uum.edu.my/7837/
https://sierra.uum.edu.my/record=b1698974~S1
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.etd.7837
record_format eprints
spelling my.uum.etd.78372022-10-11T02:45:42Z https://etd.uum.edu.my/7837/ Development of an information and communication technology works interface framework for large scale construction-based project Mohd Azahani, Md Taib T58.5-58.64 Information technology This research aims to develop an Information and Communication Technology (ICT) Works Interface Framework for large scale construction-based project in construction industry. Based on KLIA Consultancy Services Sdn Bhd’s (KLIACS) experiences in managing several large scale construction projects, interfacing problems related to ICT works have been revealed and discussed. Poor integration and coordination of works between ICT and engineering parties were the most common problem encountered in the construction-based project. The interfacing of ICT works with related engineering works should be clearly defined to ensure that neither gaps nor redundancies occurred among the parties involved. Hence, a study on the interfacing problems between ICT and engineering works is significant. A case study on an on-going construction project managed by the KLIA Consultancy Services Sdn Bhd (KLIACS) was selected to gain an insight into the types of ICT and engineering works which are usually found in construction works. An Action Research approach was applied to explore the interfacing problems to identify the common works interface between ICT and engineering, involving all the related parties and at the same time solve the problems while the project was underway. Interdisciplinary techniques such as Requirements Engineering, Focus Group and Works Interface Coordination were used to solve the interfacing problems in the Action Research cycle. At the end of the research, an ICT Works Interface Framework was successfully developed. The framework has proved to be beneficial to those involved in the interfacing works of the construction project managed by KLIACS. Theoretically, the framework provides a proven model to researchers and academia involved with field management for their curriculum module. Generally, this research provides significant contribution to the construction industry as it serves as a guide for companies or government agencies to manage ICT works involving various parties for their entire construction-based projects. 2018 Thesis NonPeerReviewed text en https://etd.uum.edu.my/7837/1/Depositpermission_s95699.pdf text en https://etd.uum.edu.my/7837/2/s95699_01.pdf Mohd Azahani, Md Taib (2018) Development of an information and communication technology works interface framework for large scale construction-based project. PhD. thesis, Universiti Utara Malaysia. https://sierra.uum.edu.my/record=b1698974~S1
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
url_provider http://etd.uum.edu.my/
language English
English
topic T58.5-58.64 Information technology
spellingShingle T58.5-58.64 Information technology
Mohd Azahani, Md Taib
Development of an information and communication technology works interface framework for large scale construction-based project
description This research aims to develop an Information and Communication Technology (ICT) Works Interface Framework for large scale construction-based project in construction industry. Based on KLIA Consultancy Services Sdn Bhd’s (KLIACS) experiences in managing several large scale construction projects, interfacing problems related to ICT works have been revealed and discussed. Poor integration and coordination of works between ICT and engineering parties were the most common problem encountered in the construction-based project. The interfacing of ICT works with related engineering works should be clearly defined to ensure that neither gaps nor redundancies occurred among the parties involved. Hence, a study on the interfacing problems between ICT and engineering works is significant. A case study on an on-going construction project managed by the KLIA Consultancy Services Sdn Bhd (KLIACS) was selected to gain an insight into the types of ICT and engineering works which are usually found in construction works. An Action Research approach was applied to explore the interfacing problems to identify the common works interface between ICT and engineering, involving all the related parties and at the same time solve the problems while the project was underway. Interdisciplinary techniques such as Requirements Engineering, Focus Group and Works Interface Coordination were used to solve the interfacing problems in the Action Research cycle. At the end of the research, an ICT Works Interface Framework was successfully developed. The framework has proved to be beneficial to those involved in the interfacing works of the construction project managed by KLIACS. Theoretically, the framework provides a proven model to researchers and academia involved with field management for their curriculum module. Generally, this research provides significant contribution to the construction industry as it serves as a guide for companies or government agencies to manage ICT works involving various parties for their entire construction-based projects.
format Thesis
author Mohd Azahani, Md Taib
author_facet Mohd Azahani, Md Taib
author_sort Mohd Azahani, Md Taib
title Development of an information and communication technology works interface framework for large scale construction-based project
title_short Development of an information and communication technology works interface framework for large scale construction-based project
title_full Development of an information and communication technology works interface framework for large scale construction-based project
title_fullStr Development of an information and communication technology works interface framework for large scale construction-based project
title_full_unstemmed Development of an information and communication technology works interface framework for large scale construction-based project
title_sort development of an information and communication technology works interface framework for large scale construction-based project
publishDate 2018
url https://etd.uum.edu.my/7837/1/Depositpermission_s95699.pdf
https://etd.uum.edu.my/7837/2/s95699_01.pdf
https://etd.uum.edu.my/7837/
https://sierra.uum.edu.my/record=b1698974~S1
_version_ 1748183195022524416
score 13.145126