Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch
A heat integrated flowsheet has been designed for hydrogen production from oil palm empty fruit bunch (EFB) via steam gasification with in-situ CO2 capture. The process energy requirement and cost are calculated from the mass balances, energy balances and the economic model of flowsheet. The flowshe...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
AIDIC
2011
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/5514/1/4CC34d01.pdf http://www.aidic.it/cet/index.html http://eprints.utp.edu.my/5514/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utp.eprints.5514 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.55142017-01-19T08:22:47Z Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch Inayat, Abrar Ahmad, Murni M Abdul Mutalib, M I Yusup, Suzana TP Chemical technology A heat integrated flowsheet has been designed for hydrogen production from oil palm empty fruit bunch (EFB) via steam gasification with in-situ CO2 capture. The process energy requirement and cost are calculated from the mass balances, energy balances and the economic model of flowsheet. The flowsheet calculation and cost minimization are carried out using MATLAB. The flowsheet under investigation includes steam generation unit, gasification unit and gas cleaning unit. For heat integration studies on the flowsheet, the pinch analysis is employed to obtain the energy efficient and self-sustained system. The heat integration study is carried out using SPRINT software. The analysis shows that considerable saving can be obtained for steam production using heat integration application as there is a large amount of available waste heat from the gas cleaning and cooling units. The results show that the minimum hot utilities required is 601.85 kJ/h and the minimum cold utilities is 13.82 kJ/h for the case of minimum temperature difference of 10 K. Furthermore, a feasible heat exchanger network that fulfills these requirements has been presented. Moreover, the cost of hydrogen production decreases from 1.91 to 1.84 US$/kg of H2 by applying heat integration approach in the flowsheet. AIDIC 2011-05 Article PeerReviewed application/pdf http://eprints.utp.edu.my/5514/1/4CC34d01.pdf http://www.aidic.it/cet/index.html Inayat, Abrar and Ahmad, Murni M and Abdul Mutalib, M I and Yusup, Suzana (2011) Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch. Chemical Engineering Transactions, 25 . pp. 971-976. ISSN 1974-9791 http://eprints.utp.edu.my/5514/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TP Chemical technology |
spellingShingle |
TP Chemical technology Inayat, Abrar Ahmad, Murni M Abdul Mutalib, M I Yusup, Suzana Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
description |
A heat integrated flowsheet has been designed for hydrogen production from oil palm empty fruit bunch (EFB) via steam gasification with in-situ CO2 capture. The process energy requirement and cost are calculated from the mass balances, energy balances and the economic model of flowsheet. The flowsheet calculation and cost minimization are carried out using MATLAB. The flowsheet under investigation includes steam generation unit, gasification unit and gas cleaning unit. For heat integration studies on the flowsheet, the pinch analysis is employed to obtain the energy efficient and self-sustained system. The heat integration study is carried out using SPRINT software. The analysis shows that considerable saving can be obtained for steam production using heat integration application as there is a large amount of available waste heat from the gas cleaning and cooling units. The results show that the minimum hot utilities required is 601.85 kJ/h and the minimum cold utilities is 13.82 kJ/h for the case of minimum temperature difference of 10 K. Furthermore, a feasible heat exchanger network that fulfills these requirements has been presented. Moreover, the cost of hydrogen production decreases from 1.91 to 1.84 US$/kg of H2 by applying heat integration approach in the flowsheet. |
format |
Article |
author |
Inayat, Abrar Ahmad, Murni M Abdul Mutalib, M I Yusup, Suzana |
author_facet |
Inayat, Abrar Ahmad, Murni M Abdul Mutalib, M I Yusup, Suzana |
author_sort |
Inayat, Abrar |
title |
Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
title_short |
Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
title_full |
Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
title_fullStr |
Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
title_full_unstemmed |
Heat Integration Analysis of Gasification Process for ydrogen Production from Oil Palm Empty Fruit Bunch |
title_sort |
heat integration analysis of gasification process for ydrogen production from oil palm empty fruit bunch |
publisher |
AIDIC |
publishDate |
2011 |
url |
http://eprints.utp.edu.my/5514/1/4CC34d01.pdf http://www.aidic.it/cet/index.html http://eprints.utp.edu.my/5514/ |
_version_ |
1738655411735625728 |
score |
13.209306 |