Fuzzy Methods in Quantitative Risk Analysis of Construction Project
This paper presents a review of fuzzy risk analysis methods in a construction project. According to the literature review that has been done, the methods can be generally classified into two types; fuzzy set based on fuzzy arithmetic operation and fuzzy inference mechanism. The recent trends are inc...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/5396/1/NPC2008_Fuzzy_Methods_in_Quantitative_Risk_Analysis.pdf http://eprints.utp.edu.my/5396/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utp.eprints.5396 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.53962017-01-19T08:26:17Z Fuzzy Methods in Quantitative Risk Analysis of Construction Project Rohman, M.Arif Idrus, Arazi TA Engineering (General). Civil engineering (General) QA76 Computer software This paper presents a review of fuzzy risk analysis methods in a construction project. According to the literature review that has been done, the methods can be generally classified into two types; fuzzy set based on fuzzy arithmetic operation and fuzzy inference mechanism. The recent trends are inclined towards the use of fuzzy inference mechanism in developing decision support system tools for risk analysis. Fuzzy risk analysis methods have been developed to provide an alternative technique to overcome the limitation of classical probability theory in construction project risk analysis. However, some gaps are still present. Some limitations related to the models are still yet to be addressed. Therefore, extended researches are still required to be conducted in some areas which have not been covered 2008-03-31 Conference or Workshop Item PeerReviewed application/pdf http://eprints.utp.edu.my/5396/1/NPC2008_Fuzzy_Methods_in_Quantitative_Risk_Analysis.pdf Rohman, M.Arif and Idrus, Arazi (2008) Fuzzy Methods in Quantitative Risk Analysis of Construction Project. In: National Prostgrawduate Conference 2008, 31 March 2008, Universiti Teknologi PETRONAS. http://eprints.utp.edu.my/5396/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
topic |
TA Engineering (General). Civil engineering (General) QA76 Computer software |
spellingShingle |
TA Engineering (General). Civil engineering (General) QA76 Computer software Rohman, M.Arif Idrus, Arazi Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
description |
This paper presents a review of fuzzy risk analysis methods in a construction project. According to the literature review that has been done, the methods can be generally classified into two types; fuzzy set based on fuzzy arithmetic operation and fuzzy inference mechanism. The recent trends are inclined towards the use of fuzzy inference mechanism in developing decision support system tools for risk analysis. Fuzzy risk analysis methods have been developed to provide an alternative technique to overcome the limitation of classical probability theory in construction project risk analysis. However, some gaps are still present. Some limitations related to the models are still yet to be addressed. Therefore, extended researches are still required to be conducted in some areas which have not been covered |
format |
Conference or Workshop Item |
author |
Rohman, M.Arif Idrus, Arazi |
author_facet |
Rohman, M.Arif Idrus, Arazi |
author_sort |
Rohman, M.Arif |
title |
Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
title_short |
Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
title_full |
Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
title_fullStr |
Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
title_full_unstemmed |
Fuzzy Methods in Quantitative Risk Analysis of Construction Project |
title_sort |
fuzzy methods in quantitative risk analysis of construction project |
publishDate |
2008 |
url |
http://eprints.utp.edu.my/5396/1/NPC2008_Fuzzy_Methods_in_Quantitative_Risk_Analysis.pdf http://eprints.utp.edu.my/5396/ |
_version_ |
1738655401781493760 |
score |
13.211869 |