Profit optimization for chemical process plant based on a probabilistic approach by incorporating material flow uncertainties

This paper reports how the economic performance of a chemical process plant is affected by material flow uncertainties from the plant inlet and outlet. Two chance-constrained optimization models were proposed. The models were tested using case studies of an existing gas processing plant. Profit opti...

Full description

Saved in:
Bibliographic Details
Main Authors: Getu, M., Mahadzir, S., Lee, M.
Format: Article
Published: 2013
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84886386532&doi=10.1016%2fj.compchemeng.2013.05.026&partnerID=40&md5=28678c43cddab78117a5103b33670824
http://eprints.utp.edu.my/32485/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This paper reports how the economic performance of a chemical process plant is affected by material flow uncertainties from the plant inlet and outlet. Two chance-constrained optimization models were proposed. The models were tested using case studies of an existing gas processing plant. Profit optimization for the case studies was made with respect to the reliability of holding the process constraints at a certain confidence level 0.5, 1. The optimal profit change for uncertainty from the plant inlet within the confidence interval 0.96, 1 was 86%. On the other hand, the optimal profit change for uncertainty from the plant outlet was only 2% for the same confidence level interval considered. This suggests that the uncertainty from the plant inlet has a major impact on the overall economic performance of the plant. Sensitivity analysis showed how uncertain parameters from both plant sides can affect the overall profit significantly. © 2013 Elsevier Ltd.