Performance evaluation of reusing produced water as fracking fluid in Angsi field

The demand for freshwater continuously increases with hydraulic fracturing operations, mainly due to unconventional reservoirs. For instance, approximately 7000�18,000m3 of water is required per well for hydraulic fracturing. Meanwhile, almost 100bbl of produced water is produced annually worldwid...

Full description

Saved in:
Bibliographic Details
Main Authors: Coomarasamy, P., Mohshim, D.F., Basri, A.H., Nasir, R., Mukhtar, H.
Format: Article
Published: Springer Science and Business Media Deutschland GmbH 2022
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85118669910&doi=10.1007%2fs11696-021-01957-5&partnerID=40&md5=fb16f62088169c2d947ab0903bde2a1c
http://eprints.utp.edu.my/28643/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first