Impact of construction waste minimization at construction site: Case study

Waste reduction in the construction sector is essential not just from the position of overall performance, but also interests escalated recently about the detrimental impact of the waste of construction materials on the natural surroundings. The reuse and recycling of construction elements used to b...

Full description

Saved in:
Bibliographic Details
Main Authors: Umar, U.A., Shafiq, N., Malakahmad, A., Nuruddin, M.F., Khamidi, M.F., Salihi, I.U.
Format: Article
Published: Penerbit UTM Press 2016
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-84968831989&doi=10.11113%2fjt.v78.8508&partnerID=40&md5=c1c6ad7045029055482f1c99e1c9bc0b
http://eprints.utp.edu.my/25516/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.25516
record_format eprints
spelling my.utp.eprints.255162021-08-27T13:03:20Z Impact of construction waste minimization at construction site: Case study Umar, U.A. Shafiq, N. Malakahmad, A. Nuruddin, M.F. Khamidi, M.F. Salihi, I.U. Waste reduction in the construction sector is essential not just from the position of overall performance, but also interests escalated recently about the detrimental impact of the waste of construction materials on the natural surroundings. The reuse and recycling of construction elements used to be substantial due to material scarcity during the war and post-war era, specifically when the price of virgin materials keep inflating. Nevertheless, the motivation to reuse and recycle construction materials has fallen ever since the flow of raw materials has grown more consistent and satisfactorily. This paper involves an ongoing sequence of waste audits at Universiti Teknologi Petronas (UTP) R&D construction sites. The methodology consists of discussion, observation and quantitative evaluations of the kinds and distribution of wastes. The finding of this study demonstrates that the project aimed at both minimizing the volume of waste generated and diverting as much waste as possible from landfill that contribute to the recycle with over 1200 tonnes of material which constitute about 73 of recycle and reused rate mainly from timber and metal. © 2016 Penerbit UTM Press. All rights reserved. Penerbit UTM Press 2016 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-84968831989&doi=10.11113%2fjt.v78.8508&partnerID=40&md5=c1c6ad7045029055482f1c99e1c9bc0b Umar, U.A. and Shafiq, N. and Malakahmad, A. and Nuruddin, M.F. and Khamidi, M.F. and Salihi, I.U. (2016) Impact of construction waste minimization at construction site: Case study. Jurnal Teknologi, 78 (5-3). pp. 33-40. http://eprints.utp.edu.my/25516/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Waste reduction in the construction sector is essential not just from the position of overall performance, but also interests escalated recently about the detrimental impact of the waste of construction materials on the natural surroundings. The reuse and recycling of construction elements used to be substantial due to material scarcity during the war and post-war era, specifically when the price of virgin materials keep inflating. Nevertheless, the motivation to reuse and recycle construction materials has fallen ever since the flow of raw materials has grown more consistent and satisfactorily. This paper involves an ongoing sequence of waste audits at Universiti Teknologi Petronas (UTP) R&D construction sites. The methodology consists of discussion, observation and quantitative evaluations of the kinds and distribution of wastes. The finding of this study demonstrates that the project aimed at both minimizing the volume of waste generated and diverting as much waste as possible from landfill that contribute to the recycle with over 1200 tonnes of material which constitute about 73 of recycle and reused rate mainly from timber and metal. © 2016 Penerbit UTM Press. All rights reserved.
format Article
author Umar, U.A.
Shafiq, N.
Malakahmad, A.
Nuruddin, M.F.
Khamidi, M.F.
Salihi, I.U.
spellingShingle Umar, U.A.
Shafiq, N.
Malakahmad, A.
Nuruddin, M.F.
Khamidi, M.F.
Salihi, I.U.
Impact of construction waste minimization at construction site: Case study
author_facet Umar, U.A.
Shafiq, N.
Malakahmad, A.
Nuruddin, M.F.
Khamidi, M.F.
Salihi, I.U.
author_sort Umar, U.A.
title Impact of construction waste minimization at construction site: Case study
title_short Impact of construction waste minimization at construction site: Case study
title_full Impact of construction waste minimization at construction site: Case study
title_fullStr Impact of construction waste minimization at construction site: Case study
title_full_unstemmed Impact of construction waste minimization at construction site: Case study
title_sort impact of construction waste minimization at construction site: case study
publisher Penerbit UTM Press
publishDate 2016
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-84968831989&doi=10.11113%2fjt.v78.8508&partnerID=40&md5=c1c6ad7045029055482f1c99e1c9bc0b
http://eprints.utp.edu.my/25516/
_version_ 1738656741110841344
score 13.214268