Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia

The implementation of Building Information Modelling (BIM) in Malaysian construction industry is considered very challenging. Although there is significant support from the government to enhance BIM adoption, the implementation of BIM is still in a very low level. Therefore, this paper is evaluating...

Full description

Saved in:
Bibliographic Details
Main Authors: Yahya Al-Ashmori, Y., Bin Othman, I., Bin Mohamad, H., Rahmawati, Y., Napiah, M.
Format: Conference or Workshop Item
Published: Institute of Physics Publishing 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85073543556&doi=10.1088%2f1757-899X%2f601%2f1%2f012024&partnerID=40&md5=f61dd811fe2a78faabeb77fdf6f63d64
http://eprints.utp.edu.my/24960/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.24960
record_format eprints
spelling my.utp.eprints.249602021-08-27T08:35:08Z Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia Yahya Al-Ashmori, Y. Bin Othman, I. Bin Mohamad, H. Rahmawati, Y. Napiah, M. The implementation of Building Information Modelling (BIM) in Malaysian construction industry is considered very challenging. Although there is significant support from the government to enhance BIM adoption, the implementation of BIM is still in a very low level. Therefore, this paper is evaluating the level of BIM use among Malaysian construction companies. The research is based on a survey and observation conducted in the state of Melaka in which 90 Malaysian companies were surveyed. Based on the evaluation of 90 construction companies, 63 questionnaires were returned and only 46 were valid for further analysis which covered the main objectives of this research. Result revealed that there is a significant drawback of BIM implementation among construction companies due to the lack of awareness of application process and technology concept. The main factor responsible for the lack of awareness was found to be the delay of organizations to use BIM on their project practices. Hence, it is recommended that organizations should be practicing the BIM process within their company. Also, organizations should have the initiative to develop their roadmap for implementation and development of individual transformation plan that gradually overcomes challenges. © Published under licence by IOP Publishing Ltd. Institute of Physics Publishing 2019 Conference or Workshop Item NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85073543556&doi=10.1088%2f1757-899X%2f601%2f1%2f012024&partnerID=40&md5=f61dd811fe2a78faabeb77fdf6f63d64 Yahya Al-Ashmori, Y. and Bin Othman, I. and Bin Mohamad, H. and Rahmawati, Y. and Napiah, M. (2019) Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia. In: UNSPECIFIED. http://eprints.utp.edu.my/24960/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description The implementation of Building Information Modelling (BIM) in Malaysian construction industry is considered very challenging. Although there is significant support from the government to enhance BIM adoption, the implementation of BIM is still in a very low level. Therefore, this paper is evaluating the level of BIM use among Malaysian construction companies. The research is based on a survey and observation conducted in the state of Melaka in which 90 Malaysian companies were surveyed. Based on the evaluation of 90 construction companies, 63 questionnaires were returned and only 46 were valid for further analysis which covered the main objectives of this research. Result revealed that there is a significant drawback of BIM implementation among construction companies due to the lack of awareness of application process and technology concept. The main factor responsible for the lack of awareness was found to be the delay of organizations to use BIM on their project practices. Hence, it is recommended that organizations should be practicing the BIM process within their company. Also, organizations should have the initiative to develop their roadmap for implementation and development of individual transformation plan that gradually overcomes challenges. © Published under licence by IOP Publishing Ltd.
format Conference or Workshop Item
author Yahya Al-Ashmori, Y.
Bin Othman, I.
Bin Mohamad, H.
Rahmawati, Y.
Napiah, M.
spellingShingle Yahya Al-Ashmori, Y.
Bin Othman, I.
Bin Mohamad, H.
Rahmawati, Y.
Napiah, M.
Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
author_facet Yahya Al-Ashmori, Y.
Bin Othman, I.
Bin Mohamad, H.
Rahmawati, Y.
Napiah, M.
author_sort Yahya Al-Ashmori, Y.
title Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
title_short Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
title_full Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
title_fullStr Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
title_full_unstemmed Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia
title_sort establishing the level of bim implementation - a case study in melaka, malaysia
publisher Institute of Physics Publishing
publishDate 2019
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85073543556&doi=10.1088%2f1757-899X%2f601%2f1%2f012024&partnerID=40&md5=f61dd811fe2a78faabeb77fdf6f63d64
http://eprints.utp.edu.my/24960/
_version_ 1738656663485808640
score 13.160551