Establishing the Level of BIM implementation - A Case Study in Melaka, Malaysia

The implementation of Building Information Modelling (BIM) in Malaysian construction industry is considered very challenging. Although there is significant support from the government to enhance BIM adoption, the implementation of BIM is still in a very low level. Therefore, this paper is evaluating...

Full description

Saved in:
Bibliographic Details
Main Authors: Yahya Al-Ashmori, Y., Bin Othman, I., Bin Mohamad, H., Rahmawati, Y., Napiah, M.
Format: Conference or Workshop Item
Published: Institute of Physics Publishing 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85073543556&doi=10.1088%2f1757-899X%2f601%2f1%2f012024&partnerID=40&md5=f61dd811fe2a78faabeb77fdf6f63d64
http://eprints.utp.edu.my/24940/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items