Wells and production functions

After identifying potentially feasible fields and at the beginning of an oil field development plan, once the oil field dimensions have been allocated, engineers determine the number of wells needed to meet production requirements and the method of extraction of the liquid hydrocarbons. © The Autho...

Full description

Saved in:
Bibliographic Details
Main Author: Ganat, T.A.-A.O.
Format: Article
Published: Springer 2020
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85084003991&doi=10.1007%2f978-3-030-45250-6_6&partnerID=40&md5=a45e026cd8c03a3f72eda37856b71e69
http://eprints.utp.edu.my/24798/
Tags: Add Tag
No Tags, Be the first to tag this record!