Investigation of maximum erosion zone in the horizontal 90° elbow

Sand transportation within flow devices causes major problems for the hydrocarbon production industry and entails crucial material removal from pipelines and leads to failure and malfunction of the piping system. The 90° elbow configuration is an indispensable flow changing device used to redirect...

Full description

Saved in:
Bibliographic Details
Main Authors: Khan, R., Ya, H.H., Pao, W., Rao, T.V.V.L.N., Alam, A., Azeem, M.
Format: Article
Published: Springer Science and Business Media Deutschland GmbH 2020
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85091266829&doi=10.1007%2f978-981-15-5753-8_21&partnerID=40&md5=6302c232b564b0a84a928616b7ea68e2
http://eprints.utp.edu.my/24705/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first