Challenges of implementing green procurement in public construction projects in Malaysia
Saved in:
Main Authors: | Alqadami, A., Zawawi, N.A., Rahmawati, Y., Alaloul, W. |
---|---|
Format: | Conference or Workshop Item |
Published: |
Institute of Physics Publishing
2020
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85086734130&doi=10.1088%2f1757-899X%2f849%2f1%2f012047&partnerID=40&md5=e63e20890629fc9555473a54c8f6cb44 http://eprints.utp.edu.my/24561/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Challenges of implementing green procurement in public construction projects in Malaysia
by: Alqadami, A., et al.
Published: (2020) -
Implementation of green procurement in the construction industry in Malaysia
by: Abdul Rahim Abdul Hamid, Ameer Fawwaz Othman @ Seman
Published: (2018) -
E-Procurement Implementation for Projects (Analysis, Challenges, and Solutions)
by: Jalal Faraj, Salem Almadani
Published: (2016) -
Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
by: Alwaely, Ammar Mohammed Oda
Published: (2019) -
e-Procurement in Malaysian construction industry: benefits and challenges in implementation
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2017)