Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process

In this paper the process improvement activity in a production system towards streamlining the production flow using the PDCA (Plan-Do-Check-Act) model for manufacturing industries was investigated by focusing on the waste of overburden (muri) for manual handling process. Currently the implementatio...

Full description

Saved in:
Bibliographic Details
Main Authors: Ani, M.N.C., Kamaruddin, S., Azid, I.A.
Format: Conference or Workshop Item
Published: IEOM Society 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85067242866&partnerID=40&md5=b8279f58ddfa680822acaec80b480360
http://eprints.utp.edu.my/23603/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.23603
record_format eprints
spelling my.utp.eprints.236032021-08-19T08:09:48Z Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process Ani, M.N.C. Kamaruddin, S. Azid, I.A. In this paper the process improvement activity in a production system towards streamlining the production flow using the PDCA (Plan-Do-Check-Act) model for manufacturing industries was investigated by focusing on the waste of overburden (muri) for manual handling process. Currently the implementation of the continuous improvement in industries has numerous versions focusing on the elimination of the wastes (muda) but less consideration of work on overburden (muri). One of the issues in continuous improvement activity in manufacturing industries is to overlook other wastes as defined by Lean Manufacturing (LM) which are Mura and Muri. Targeting on the optimizing and streamlining the production flow, the detailed steps and processes of PDCA were used in this research based on experiences, knowledges and availability of the data collection. Thus, in this paper, detailed adaptation process for each phase in PDCA was investigated through published literature, current implementation of PDCA in case study industry and performance of the production system in the case study industry. Based on the investigation and implementation of the case study industry, the result shows an adaptation of PCDA in eliminating the waste of overburden (muri) with suitable tools for each phase complements well with the continuous improvement program. The production output as determined through the developed PCDA tools increased by 17.7 by the end of continuous improvement program. © IEOM Society International. IEOM Society 2019 Conference or Workshop Item NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85067242866&partnerID=40&md5=b8279f58ddfa680822acaec80b480360 Ani, M.N.C. and Kamaruddin, S. and Azid, I.A. (2019) Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process. In: UNSPECIFIED. http://eprints.utp.edu.my/23603/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description In this paper the process improvement activity in a production system towards streamlining the production flow using the PDCA (Plan-Do-Check-Act) model for manufacturing industries was investigated by focusing on the waste of overburden (muri) for manual handling process. Currently the implementation of the continuous improvement in industries has numerous versions focusing on the elimination of the wastes (muda) but less consideration of work on overburden (muri). One of the issues in continuous improvement activity in manufacturing industries is to overlook other wastes as defined by Lean Manufacturing (LM) which are Mura and Muri. Targeting on the optimizing and streamlining the production flow, the detailed steps and processes of PDCA were used in this research based on experiences, knowledges and availability of the data collection. Thus, in this paper, detailed adaptation process for each phase in PDCA was investigated through published literature, current implementation of PDCA in case study industry and performance of the production system in the case study industry. Based on the investigation and implementation of the case study industry, the result shows an adaptation of PCDA in eliminating the waste of overburden (muri) with suitable tools for each phase complements well with the continuous improvement program. The production output as determined through the developed PCDA tools increased by 17.7 by the end of continuous improvement program. © IEOM Society International.
format Conference or Workshop Item
author Ani, M.N.C.
Kamaruddin, S.
Azid, I.A.
spellingShingle Ani, M.N.C.
Kamaruddin, S.
Azid, I.A.
Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
author_facet Ani, M.N.C.
Kamaruddin, S.
Azid, I.A.
author_sort Ani, M.N.C.
title Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
title_short Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
title_full Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
title_fullStr Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
title_full_unstemmed Streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
title_sort streamlining the flow of production system through elimination the waste of the overburden (muri) for manual handling process
publisher IEOM Society
publishDate 2019
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85067242866&partnerID=40&md5=b8279f58ddfa680822acaec80b480360
http://eprints.utp.edu.my/23603/
_version_ 1738656495425290240
score 13.160551