The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study

Single-Minute Exchange of Die (SMED) is a popular method used to optimize the die change processing time. The purpose of this study is to identify on how to reduce set-up time by using Embedded SMED in automotive stamping press line. An actual case study at an automotive company XYZ in Malaysia was...

Full description

Saved in:
Bibliographic Details
Main Authors: Basri, A.Q., Mohamed, N.M.Z.N., Yasir, K.A.S.H.M., Fazi, H.M., Fudzin, A.F.
Format: Article
Published: 2019
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85061003080&doi=10.1088%2f1757-899X%2f469%2f1%2f012005&partnerID=40&md5=ba347362b706207c803ef09cd6e927c4
http://eprints.utp.edu.my/22175/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.22175
record_format eprints
spelling my.utp.eprints.221752019-02-28T07:58:37Z The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study Basri, A.Q. Mohamed, N.M.Z.N. Yasir, K.A.S.H.M. Fazi, H.M. Fudzin, A.F. Single-Minute Exchange of Die (SMED) is a popular method used to optimize the die change processing time. The purpose of this study is to identify on how to reduce set-up time by using Embedded SMED in automotive stamping press line. An actual case study at an automotive company XYZ in Malaysia was conducted based on parts supply issues. The observations, assessments and standard manufacturing practices were carried out during the study. WITNESS simulation software was used to identify the critical processes and also enable the validation of actual output based on the production. The result of the particular press line (combination of 800 Tons and 500 Tons machines) which produced 6 parts in 1-shift operations with small lot size output has been identified and improved. The significant improvement based on the Embedded SMED compared to conventional SMED approach showed a decreasing change-over time from an average of 12.51 minutes to 9.41 minutes (effectively a single-digit minute) resulting in circa 62 reduction. © Published under licence by IOP Publishing Ltd. 2019 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85061003080&doi=10.1088%2f1757-899X%2f469%2f1%2f012005&partnerID=40&md5=ba347362b706207c803ef09cd6e927c4 Basri, A.Q. and Mohamed, N.M.Z.N. and Yasir, K.A.S.H.M. and Fazi, H.M. and Fudzin, A.F. (2019) The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study. IOP Conference Series: Materials Science and Engineering, 469 (1). http://eprints.utp.edu.my/22175/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Single-Minute Exchange of Die (SMED) is a popular method used to optimize the die change processing time. The purpose of this study is to identify on how to reduce set-up time by using Embedded SMED in automotive stamping press line. An actual case study at an automotive company XYZ in Malaysia was conducted based on parts supply issues. The observations, assessments and standard manufacturing practices were carried out during the study. WITNESS simulation software was used to identify the critical processes and also enable the validation of actual output based on the production. The result of the particular press line (combination of 800 Tons and 500 Tons machines) which produced 6 parts in 1-shift operations with small lot size output has been identified and improved. The significant improvement based on the Embedded SMED compared to conventional SMED approach showed a decreasing change-over time from an average of 12.51 minutes to 9.41 minutes (effectively a single-digit minute) resulting in circa 62 reduction. © Published under licence by IOP Publishing Ltd.
format Article
author Basri, A.Q.
Mohamed, N.M.Z.N.
Yasir, K.A.S.H.M.
Fazi, H.M.
Fudzin, A.F.
spellingShingle Basri, A.Q.
Mohamed, N.M.Z.N.
Yasir, K.A.S.H.M.
Fazi, H.M.
Fudzin, A.F.
The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
author_facet Basri, A.Q.
Mohamed, N.M.Z.N.
Yasir, K.A.S.H.M.
Fazi, H.M.
Fudzin, A.F.
author_sort Basri, A.Q.
title The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
title_short The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
title_full The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
title_fullStr The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
title_full_unstemmed The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
title_sort validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded smed frame-work versus smed approach: a witness simulation case study
publishDate 2019
url https://www.scopus.com/inward/record.uri?eid=2-s2.0-85061003080&doi=10.1088%2f1757-899X%2f469%2f1%2f012005&partnerID=40&md5=ba347362b706207c803ef09cd6e927c4
http://eprints.utp.edu.my/22175/
_version_ 1738656388701224960
score 13.159267