Towards just-in-time (JIT) production system through enhancing part preparation process

In this paper the improvement activity in manufacturing plant has been conducted by focusing outside of production process which is part preparation activity in warehouse area. The Plan-Do-Check-Act (PDCA) cycle has been adopted to identify, analyze, verify and implement the improvement activity wit...

Full description

Saved in:
Bibliographic Details
Main Authors: Che-Ani, M.N., Kamaruddin, S., Azid, I.A.
Format: Article
Published: IEEE Computer Society 2018
Online Access:https://www.scopus.com/inward/record.uri?eid=2-s2.0-85045268724&doi=10.1109%2fIEEM.2017.8289975&partnerID=40&md5=bf514ad6c7ebc1bb0a5ca9ecc41f65a8
http://eprints.utp.edu.my/21769/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In this paper the improvement activity in manufacturing plant has been conducted by focusing outside of production process which is part preparation activity in warehouse area. The Plan-Do-Check-Act (PDCA) cycle has been adopted to identify, analyze, verify and implement the improvement activity with the purpose of creating better management of the part preparation activity. To ensure the successful adaptation of PDCA cycle, a small group consisting of cross-functional team members has been formed to analyze and solve the issue. The ultimate objective is to ensure the process improvement will optimize the efficiency of production systems and achieving the Just-in-Time (JIT) concept. Based on the investigation and implementation of the case study industry, the result shows a successful adaptation of PDCA cycle outside of the production process. The waiting time of the production due to misaligned time of the pre-preparation part had been identified as a root cause and successfully eliminated. © 2017 IEEE.