Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production
In this paper, the improvement activity in manufacturing plant has been conducted by focusing on the effective Kanban size to achieve just-in-time (JIT) production system. The results of the implementation in case study was identified, analyzed and verified by utilizing the effective feeders of Kanb...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Published: |
Institute of Electrical and Electronics Engineers Inc.
2018
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85049921450&doi=10.1109%2fICCAR.2018.8384692&partnerID=40&md5=2d892ad004cb54bb52260542ef9ee0cf http://eprints.utp.edu.my/20844/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utp.eprints.20844 |
---|---|
record_format |
eprints |
spelling |
my.utp.eprints.208442019-02-26T02:31:56Z Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production Ani, C. Norzaimi, M. Kamaruddin, Shahrul, Azid, A. Ishak, In this paper, the improvement activity in manufacturing plant has been conducted by focusing on the effective Kanban size to achieve just-in-time (JIT) production system. The results of the implementation in case study was identified, analyzed and verified by utilizing the effective feeders of Kanban size through queuing system analysis. The ultimate objective was to ensure adaptation of the developed Kanban approach using effective feeders for in-house production system was implemented, in which work-in-progress (wip) 'triggering system' was introduced to ensure sustainability of the Kanban system and to achieve the JIT production system. Based on the implementation from the case study industry, the obtained result for effective feeders of Kanban size was dual feeders and with the waste of waiting eliminated by 36.64. Through effective production Kanban size, the waiting time of the production process in production losses time due to the pre-preparation part had been identified and successfully minimized. © 2018 IEEE. Institute of Electrical and Electronics Engineers Inc. 2018 Article NonPeerReviewed https://www.scopus.com/inward/record.uri?eid=2-s2.0-85049921450&doi=10.1109%2fICCAR.2018.8384692&partnerID=40&md5=2d892ad004cb54bb52260542ef9ee0cf Ani, C. and Norzaimi, M. and Kamaruddin, and Shahrul, and Azid, A. and Ishak, (2018) Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production. Proceedings - 2018 4th International Conference on Control, Automation and Robotics, ICCAR 2018 . pp. 316-320. http://eprints.utp.edu.my/20844/ |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
description |
In this paper, the improvement activity in manufacturing plant has been conducted by focusing on the effective Kanban size to achieve just-in-time (JIT) production system. The results of the implementation in case study was identified, analyzed and verified by utilizing the effective feeders of Kanban size through queuing system analysis. The ultimate objective was to ensure adaptation of the developed Kanban approach using effective feeders for in-house production system was implemented, in which work-in-progress (wip) 'triggering system' was introduced to ensure sustainability of the Kanban system and to achieve the JIT production system. Based on the implementation from the case study industry, the obtained result for effective feeders of Kanban size was dual feeders and with the waste of waiting eliminated by 36.64. Through effective production Kanban size, the waiting time of the production process in production losses time due to the pre-preparation part had been identified and successfully minimized. © 2018 IEEE. |
format |
Article |
author |
Ani, C. Norzaimi, M. Kamaruddin, Shahrul, Azid, A. Ishak, |
spellingShingle |
Ani, C. Norzaimi, M. Kamaruddin, Shahrul, Azid, A. Ishak, Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
author_facet |
Ani, C. Norzaimi, M. Kamaruddin, Shahrul, Azid, A. Ishak, |
author_sort |
Ani, C. |
title |
Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
title_short |
Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
title_full |
Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
title_fullStr |
Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
title_full_unstemmed |
Analysis of the effective production Kanban size with triggering system for achieving just-in-time (JIT) production |
title_sort |
analysis of the effective production kanban size with triggering system for achieving just-in-time (jit) production |
publisher |
Institute of Electrical and Electronics Engineers Inc. |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85049921450&doi=10.1109%2fICCAR.2018.8384692&partnerID=40&md5=2d892ad004cb54bb52260542ef9ee0cf http://eprints.utp.edu.my/20844/ |
_version_ |
1738656240746102784 |
score |
13.160551 |