Integrated scheduling and RTO of RGP with MPC and PI controllers
This study proposes an integrated framework of scheduling and Real-Time Optimization (RTO) of a Refrigerated Gas Plant (RGP). At the top layer, a high fidelity dynamic model of RGP is subjected to scheduling of plant operating mode from natural gas liquids to sales gas and vice-versa. Set points fro...
Saved in:
Main Authors: | , |
---|---|
格式: | Citation Index Journal |
出版: |
2009
|
主题: | |
在线阅读: | http://eprints.utp.edu.my/1733/1/paper.pdf http://eprints.utp.edu.my/1733/2/Integrated_Scheduling_and_RTO_of_RGP_with_MPC_and_PI_Controllers.pdf http://scialert.net/fulltext/?doi=jas.2009.3027.3033&org=11 http://eprints.utp.edu.my/1733/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|