Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant

The use of distributed power generation has advantage as well as disadvantage. One of the disadvantages is that the plant requires a dependable redundancy system to provide back up of power during failure of its power generation equipment. This paper presents a study on techno-economic assessment of...

Full description

Saved in:
Bibliographic Details
Main Author: Abd Majid, Mohd Amin
Format: Citation Index Journal
Published: 2014
Online Access:http://eprints.utp.edu.my/11640/1/matecconf_icper2014_05002.pdf
http://eprints.utp.edu.my/11640/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.11640
record_format eprints
spelling my.utp.eprints.116402015-04-28T02:54:10Z Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant Abd Majid, Mohd Amin The use of distributed power generation has advantage as well as disadvantage. One of the disadvantages is that the plant requires a dependable redundancy system to provide back up of power during failure of its power generation equipment. This paper presents a study on techno-economic assessment of redundancy systems for a cogeneration plant. Three redundancy systems were investigated; using public utility,generator set and gas turbine as back up during failures. Results from the analysis indicate that using public utility provides technical as well as economic advantages in comparison to using generator set or turbine as back up. However, the economic advantage of the public utility depends on the frequency of failures the plant will experience as well on the maximum demand charge. From the break even analysis of the understudied plant, if the number of failures exceeds 3 failures per year for the case of maximum demand charge of RM56.80, it is more economical to install a generator set as redundancy. The study will be useful for the co-generator operators to evaluate the feasibility of redundancy systems. 2014 Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/11640/1/matecconf_icper2014_05002.pdf Abd Majid, Mohd Amin (2014) Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant. [Citation Index Journal] http://eprints.utp.edu.my/11640/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description The use of distributed power generation has advantage as well as disadvantage. One of the disadvantages is that the plant requires a dependable redundancy system to provide back up of power during failure of its power generation equipment. This paper presents a study on techno-economic assessment of redundancy systems for a cogeneration plant. Three redundancy systems were investigated; using public utility,generator set and gas turbine as back up during failures. Results from the analysis indicate that using public utility provides technical as well as economic advantages in comparison to using generator set or turbine as back up. However, the economic advantage of the public utility depends on the frequency of failures the plant will experience as well on the maximum demand charge. From the break even analysis of the understudied plant, if the number of failures exceeds 3 failures per year for the case of maximum demand charge of RM56.80, it is more economical to install a generator set as redundancy. The study will be useful for the co-generator operators to evaluate the feasibility of redundancy systems.
format Citation Index Journal
author Abd Majid, Mohd Amin
spellingShingle Abd Majid, Mohd Amin
Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
author_facet Abd Majid, Mohd Amin
author_sort Abd Majid, Mohd Amin
title Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
title_short Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
title_full Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
title_fullStr Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
title_full_unstemmed Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant
title_sort techno-economic assessment of redundancy systems for cogeneration plant
publishDate 2014
url http://eprints.utp.edu.my/11640/1/matecconf_icper2014_05002.pdf
http://eprints.utp.edu.my/11640/
_version_ 1738655969621049344
score 13.214268