Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah

Load forecast has an important role in planning and operations in power generation plant. Many new forecast systems have been presented and proposed in recent years. Gas District Cooling (GDC) plant is built to supply electricity and chilled water for Universiti Teknologi PETRONAS (UTP). It operates...

Full description

Saved in:
Bibliographic Details
Main Authors: Khamis, M. F. I., Baharudin , Z., Hamid, Nor Hisham, Abdullah, M. F., Nordin, F. T.
Format: Non-Citation Index Journal
Published: 2013
Subjects:
Online Access:http://eprints.utp.edu.my/10179/1/Short%20Term%20Load%20Forecast%20for%20Small%20Scale%20Power%20System%20Using%20Fuzzy%20Logic.pdf
http://eprints.utp.edu.my/10179/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.10179
record_format eprints
spelling my.utp.eprints.101792017-01-19T08:21:10Z Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah Khamis, M. F. I. Baharudin , Z. Hamid, Nor Hisham Abdullah, M. F. Nordin, F. T. TK Electrical engineering. Electronics Nuclear engineering Load forecast has an important role in planning and operations in power generation plant. Many new forecast systems have been presented and proposed in recent years. Gas District Cooling (GDC) plant is built to supply electricity and chilled water for Universiti Teknologi PETRONAS (UTP). It operates on island operation during normal mode with utility company supply on hot standby mode. The plant has two generation units rated at 4.2 MW each, with a maximum generation capacity of 8.4 MW. In this paper, a practical short term load forecasting (STLF) method for UTP is presented. In the proposed method, a fuzzy logic approach is used and the STLF model is designed based on UTP semester January 2009 electricity demand data. The proposed model is tested with actual load data for January till June 2009 period. The test results show that the mean absolute percentage error of 4.76%. 2013 Non-Citation Index Journal PeerReviewed application/pdf http://eprints.utp.edu.my/10179/1/Short%20Term%20Load%20Forecast%20for%20Small%20Scale%20Power%20System%20Using%20Fuzzy%20Logic.pdf Khamis, M. F. I. and Baharudin , Z. and Hamid, Nor Hisham and Abdullah, M. F. and Nordin, F. T. (2013) Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah. [Non-Citation Index Journal] http://eprints.utp.edu.my/10179/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Khamis, M. F. I.
Baharudin , Z.
Hamid, Nor Hisham
Abdullah, M. F.
Nordin, F. T.
Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
description Load forecast has an important role in planning and operations in power generation plant. Many new forecast systems have been presented and proposed in recent years. Gas District Cooling (GDC) plant is built to supply electricity and chilled water for Universiti Teknologi PETRONAS (UTP). It operates on island operation during normal mode with utility company supply on hot standby mode. The plant has two generation units rated at 4.2 MW each, with a maximum generation capacity of 8.4 MW. In this paper, a practical short term load forecasting (STLF) method for UTP is presented. In the proposed method, a fuzzy logic approach is used and the STLF model is designed based on UTP semester January 2009 electricity demand data. The proposed model is tested with actual load data for January till June 2009 period. The test results show that the mean absolute percentage error of 4.76%.
format Non-Citation Index Journal
author Khamis, M. F. I.
Baharudin , Z.
Hamid, Nor Hisham
Abdullah, M. F.
Nordin, F. T.
author_facet Khamis, M. F. I.
Baharudin , Z.
Hamid, Nor Hisham
Abdullah, M. F.
Nordin, F. T.
author_sort Khamis, M. F. I.
title Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
title_short Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
title_full Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
title_fullStr Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
title_full_unstemmed Short Term Load Forecast for Small Scale Power System Using Fuzzy Logic M.F.I. Khamis*, Z. Baharudin, N. H. Hamid, M. F. Abdullah
title_sort short term load forecast for small scale power system using fuzzy logic m.f.i. khamis*, z. baharudin, n. h. hamid, m. f. abdullah
publishDate 2013
url http://eprints.utp.edu.my/10179/1/Short%20Term%20Load%20Forecast%20for%20Small%20Scale%20Power%20System%20Using%20Fuzzy%20Logic.pdf
http://eprints.utp.edu.my/10179/
_version_ 1738655820071043072
score 13.188404