The factors of delay in local authorities’ real estate development approval

The purpose of this study is to investigate the factors of delay in local authorities’ approval process, average time taken in every approval process and to find out the authorities’ departments that are facing delay issues in approval process. Delay issues in approval process are very critical to a...

Full description

Saved in:
Bibliographic Details
Main Author: Ting, Shu Jie
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:http://eprints.utm.my/id/eprint/99757/1/TingShuJieMFABU2022.pdf
http://eprints.utm.my/id/eprint/99757/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.99757
record_format eprints
spelling my.utm.997572023-03-19T10:35:46Z http://eprints.utm.my/id/eprint/99757/ The factors of delay in local authorities’ real estate development approval Ting, Shu Jie HD1394-1394.5 Real estate management The purpose of this study is to investigate the factors of delay in local authorities’ approval process, average time taken in every approval process and to find out the authorities’ departments that are facing delay issues in approval process. Delay issues in approval process are very critical to a success of a real estate development project. Finding out the factors of delay in local authorities’ approval process can help to improve the delay issues and also improve the efficiency of the approval process. According to the respondents, there are two departments in Majlis Perbandaran Kulai (Mpku) which are Planning Department and Engineering Department facing serious delay issues. These two departments must look for new strategies to improve the current delay issues. 30 sets of questionnaires are analysed in this study. Descriptive and Mean analysis are used to analyse the questionnaires collected from land surveyor, town planner, architect, engineers, landscape architect and developer. From the analysis, the main factors of delay and the average time taken in every approval process are found out. The results from the analysis provide ideas to implement a strategy such as KPI system, digital platform, feedbacks from the applicants, training programs and hiring more manpower in some departments. 2022 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/99757/1/TingShuJieMFABU2022.pdf Ting, Shu Jie (2022) The factors of delay in local authorities’ real estate development approval. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment & Surveying. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150023
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HD1394-1394.5 Real estate management
spellingShingle HD1394-1394.5 Real estate management
Ting, Shu Jie
The factors of delay in local authorities’ real estate development approval
description The purpose of this study is to investigate the factors of delay in local authorities’ approval process, average time taken in every approval process and to find out the authorities’ departments that are facing delay issues in approval process. Delay issues in approval process are very critical to a success of a real estate development project. Finding out the factors of delay in local authorities’ approval process can help to improve the delay issues and also improve the efficiency of the approval process. According to the respondents, there are two departments in Majlis Perbandaran Kulai (Mpku) which are Planning Department and Engineering Department facing serious delay issues. These two departments must look for new strategies to improve the current delay issues. 30 sets of questionnaires are analysed in this study. Descriptive and Mean analysis are used to analyse the questionnaires collected from land surveyor, town planner, architect, engineers, landscape architect and developer. From the analysis, the main factors of delay and the average time taken in every approval process are found out. The results from the analysis provide ideas to implement a strategy such as KPI system, digital platform, feedbacks from the applicants, training programs and hiring more manpower in some departments.
format Thesis
author Ting, Shu Jie
author_facet Ting, Shu Jie
author_sort Ting, Shu Jie
title The factors of delay in local authorities’ real estate development approval
title_short The factors of delay in local authorities’ real estate development approval
title_full The factors of delay in local authorities’ real estate development approval
title_fullStr The factors of delay in local authorities’ real estate development approval
title_full_unstemmed The factors of delay in local authorities’ real estate development approval
title_sort factors of delay in local authorities’ real estate development approval
publishDate 2022
url http://eprints.utm.my/id/eprint/99757/1/TingShuJieMFABU2022.pdf
http://eprints.utm.my/id/eprint/99757/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:150023
_version_ 1761616374781706240
score 13.18916