Variation and its valuation in design-build contract with regard to the public sector of Malaysia
Previous studies have shown that using a design-build approach may help keep costs down and avoid or significantly reduce the number of variation orders required. Despite this, there is always the possibility for variation to occur. According to the Auditor-General’s Report 2018, several design-buil...
Saved in:
Main Author: | Ismail, Nazaitul Hazira |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/99667/1/NazaitulHaziraIsmailMFABU2022.pdf http://eprints.utm.my/id/eprint/99667/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:149992 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Variation orders in design and build contracts
by: Heng, Robert Wei Kiong
Published: (2009) -
Valuation of interim payment : contract terms and statutes
by: Nayan, Roselan
Published: (2010) -
Disputes in design and build construction contract
by: Jasri, Siti Aishah Aqilah
Published: (2011) -
Variation order in lump sum contract
by: Mohayidin, Noor Amalina
Published: (2014) -
A survey on problem faced by contractors using design and build contract
by: Nurhajar, Abd Rahman
Published: (2009)