Highway interchange simulation

This paper presents a real case study endeavor to apply highway interchange simulation distribution of vehicle movement by using modeling to review, assess, and improve the current traffic practices in Malaysia. First, building the implementation process diagram for a traffic modeling simulation and...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamed Balrwin, Rafeg Ali
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.utm.my/id/eprint/9669/1/RafegAliMFKA2008.pdf
http://eprints.utm.my/id/eprint/9669/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:54855
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.9669
record_format eprints
spelling my.utm.96692018-10-14T07:21:27Z http://eprints.utm.my/id/eprint/9669/ Highway interchange simulation Mohamed Balrwin, Rafeg Ali TE Highway engineering. Roads and pavements TA Engineering (General). Civil engineering (General) This paper presents a real case study endeavor to apply highway interchange simulation distribution of vehicle movement by using modeling to review, assess, and improve the current traffic practices in Malaysia. First, building the implementation process diagram for a traffic modeling simulation and determine the flow sequence with vehicles quantity. Secondly, Time measurement for implementation processes and monitor, control the traffic flow which presented in three interchanges. Finally, the interchanges are presented from (Skudai to Johor Bahru) that needed to finish the overall traffic cycle time. Furthermore, the important parameters to build the simulation processes are vehicles quantity, lanes number and time factor. Therefore, the case study data were obtained in two stages: (i) during the morning period and (ii) during the evening period. Consequently, the data were collected with observation. The importance of traffic work flow in a developing country was clarified as time-based analysis, in which the completion cycle time of the highway project in the overall duration to vehicles were calculated separately by using Witness (2001) software. As a result the output is depended on the quantity of vehicles for each interchanges and time period by applying the simulation. 2008-11 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/9669/1/RafegAliMFKA2008.pdf Mohamed Balrwin, Rafeg Ali (2008) Highway interchange simulation. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:54855
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TE Highway engineering. Roads and pavements
TA Engineering (General). Civil engineering (General)
spellingShingle TE Highway engineering. Roads and pavements
TA Engineering (General). Civil engineering (General)
Mohamed Balrwin, Rafeg Ali
Highway interchange simulation
description This paper presents a real case study endeavor to apply highway interchange simulation distribution of vehicle movement by using modeling to review, assess, and improve the current traffic practices in Malaysia. First, building the implementation process diagram for a traffic modeling simulation and determine the flow sequence with vehicles quantity. Secondly, Time measurement for implementation processes and monitor, control the traffic flow which presented in three interchanges. Finally, the interchanges are presented from (Skudai to Johor Bahru) that needed to finish the overall traffic cycle time. Furthermore, the important parameters to build the simulation processes are vehicles quantity, lanes number and time factor. Therefore, the case study data were obtained in two stages: (i) during the morning period and (ii) during the evening period. Consequently, the data were collected with observation. The importance of traffic work flow in a developing country was clarified as time-based analysis, in which the completion cycle time of the highway project in the overall duration to vehicles were calculated separately by using Witness (2001) software. As a result the output is depended on the quantity of vehicles for each interchanges and time period by applying the simulation.
format Thesis
author Mohamed Balrwin, Rafeg Ali
author_facet Mohamed Balrwin, Rafeg Ali
author_sort Mohamed Balrwin, Rafeg Ali
title Highway interchange simulation
title_short Highway interchange simulation
title_full Highway interchange simulation
title_fullStr Highway interchange simulation
title_full_unstemmed Highway interchange simulation
title_sort highway interchange simulation
publishDate 2008
url http://eprints.utm.my/id/eprint/9669/1/RafegAliMFKA2008.pdf
http://eprints.utm.my/id/eprint/9669/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:54855
_version_ 1643645221201772544
score 13.160551