Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan

Cost Benefits Analysis (CBA) is an appraisal investment method that serves as a Valuation Development Program Guideline for government in Malaysia including Local Government under Surat Pekeliling Am Bil. 3 Tahun 2005. In this research CBA is used to appraise the capital investment on system develop...

Full description

Saved in:
Bibliographic Details
Main Author: Ronggitom, Johny
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:http://eprints.utm.my/id/eprint/9561/1/JohnyRonggitomMFKSG2008.pdf
http://eprints.utm.my/id/eprint/9561/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.9561
record_format eprints
spelling my.utm.95612018-07-23T05:36:41Z http://eprints.utm.my/id/eprint/9561/ Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan Ronggitom, Johny QA75 Electronic computers. Computer science HJ Public Finance Cost Benefits Analysis (CBA) is an appraisal investment method that serves as a Valuation Development Program Guideline for government in Malaysia including Local Government under Surat Pekeliling Am Bil. 3 Tahun 2005. In this research CBA is used to appraise the capital investment on system development in Sandakan Municipal Council's assessment administration. The costs and benefits of Geographic Information System (GIS) development attained is compared with the cost and benefits from other alternatives which is the current status quo and the current improvable alternative system. The purpose of comparing the costs and benefits are to determine the financial liability and economy in every alternative, which serve as the foundation in making a quality decision in selecting the most suitable, competent, efficient and capable in the process of development. All ten methodologies had been carried out with the four most important methods: (a) GIS model; (b) costs estimation; (c) benefits estimation; and (d) CBA itself. The final result of this research that the net present value of GIS development alternatives shows the highest with the amount of RM44.3 million and payback period is 2 years and 0.5 month. Ratio benefits to costs and ratio increase benefits to costs for GIS development alternatives also the highest with 13.22 and 3.47 respectively. Meanwhile, the comparison relative value for both quantitative and qualitative benefits for GIS development also showed the highest, 3.36. The summary of this research shows that GIS development is the best and suitable application for administration assessment system in Sandakan Municipal Council based on the discounted gross value and the cost and benefits ratio shows the highest for quantitative and qualitative benefits. 2008-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/9561/1/JohnyRonggitomMFKSG2008.pdf Ronggitom, Johny (2008) Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan. Masters thesis, Universiti Teknologi Malaysia, Faculty Geoinformation Science and Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic QA75 Electronic computers. Computer science
HJ Public Finance
spellingShingle QA75 Electronic computers. Computer science
HJ Public Finance
Ronggitom, Johny
Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
description Cost Benefits Analysis (CBA) is an appraisal investment method that serves as a Valuation Development Program Guideline for government in Malaysia including Local Government under Surat Pekeliling Am Bil. 3 Tahun 2005. In this research CBA is used to appraise the capital investment on system development in Sandakan Municipal Council's assessment administration. The costs and benefits of Geographic Information System (GIS) development attained is compared with the cost and benefits from other alternatives which is the current status quo and the current improvable alternative system. The purpose of comparing the costs and benefits are to determine the financial liability and economy in every alternative, which serve as the foundation in making a quality decision in selecting the most suitable, competent, efficient and capable in the process of development. All ten methodologies had been carried out with the four most important methods: (a) GIS model; (b) costs estimation; (c) benefits estimation; and (d) CBA itself. The final result of this research that the net present value of GIS development alternatives shows the highest with the amount of RM44.3 million and payback period is 2 years and 0.5 month. Ratio benefits to costs and ratio increase benefits to costs for GIS development alternatives also the highest with 13.22 and 3.47 respectively. Meanwhile, the comparison relative value for both quantitative and qualitative benefits for GIS development also showed the highest, 3.36. The summary of this research shows that GIS development is the best and suitable application for administration assessment system in Sandakan Municipal Council based on the discounted gross value and the cost and benefits ratio shows the highest for quantitative and qualitative benefits.
format Thesis
author Ronggitom, Johny
author_facet Ronggitom, Johny
author_sort Ronggitom, Johny
title Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
title_short Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
title_full Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
title_fullStr Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
title_full_unstemmed Kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran Majlis Perbandaran Sandakan
title_sort kos dan faedah pembangunan sistem maklumat geografi untuk sistem pentadbiran kadaran majlis perbandaran sandakan
publishDate 2008
url http://eprints.utm.my/id/eprint/9561/1/JohnyRonggitomMFKSG2008.pdf
http://eprints.utm.my/id/eprint/9561/
_version_ 1643645189168824320
score 13.212927