Life cycle assessment on a 500 MW oil-fired power plant in Sudan
In this study, the methodology of life cycle assessment was used to assess the environmental impacts of a 500MW oil-fired power plant in Sudan. Ecoinvent database along with primary data obtained from the Sudanese Thermal Power Generating Company Ltd (STPGC) were utilized. Life cycle analysis was co...
Saved in:
Main Authors: | Eltayeb, O. A., Rahman, M. M., Saat, A., Faizal, H. M. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/93453/1/MdMizanurRahman2020_LifeCycleAssessmentona500MW.pdf http://eprints.utm.my/id/eprint/93453/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
1000mw supercritical coal-fired power plant at Tanjung Bin to be delivered by Alstom
by: Anon
Published: (2013) -
Life cycle assessment of rice straw co-firing with coal power generation in Malaysia
by: Shafie, S.M., et al.
Published: (2017) -
1MDB clarifies issues on 50MW solar power plant in Kedah
by: Anon
Published: (2016) -
Life-Cycle Assessment of Wastewater Treatment Plant
by: Tuan Yahya, Tuan Muhammad Lukmanul Hakim
Published: (2015) -
Environmental considerations for the 3 x 700MW coal-fired Manjung Project
by: Amir, Mahmud, et al.
Published: (2011)