Strategy of minimizing delay in public construction projects through implementation of electronic procurement system

Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this s...

Full description

Saved in:
Bibliographic Details
Main Author: Alwaely, Ammar Mohammed Oda
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf
http://eprints.utm.my/id/eprint/92756/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134378
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.92756
record_format eprints
spelling my.utm.927562021-10-28T10:25:27Z http://eprints.utm.my/id/eprint/92756/ Strategy of minimizing delay in public construction projects through implementation of electronic procurement system Alwaely, Ammar Mohammed Oda TA Engineering (General). Civil engineering (General) Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this study is outline the strategy of minimizing delays through implementation of electronic-procurement system in public construction projects. There are three objectives to achieve this aim. First, determining the relation of procurement systems used with the delay factors. Second, determining the contribution of e-procurement systems in minimizing delays. Third, suggesting an appropriate strategy to assist in carrying out an effective e-procurement system for public construction projects. These objectives were achieved through an intensive literature review and a survey which included a questionnaire used to assess the perceptions of the main participants involved in the construction projects. Interviews conducted with experts to validate the questionnaire form before distributing. The questionnaire was divided into three sections. The main section focused on the causes of delay, which related to procurement system. The 34 causes compiled through the literature review and the interview with experts were classified into four groups according to phase related. Answers collected from 53 respondents representing the parties involved in the construction projects. Data collected was analysed quantitatively and ranked through the Statistical Package for the Social Sciences (SPSS) to identify the significant effects of the procurement system on the delay. It was concluded that the most effective delay factors related to procurement system in Iraq are: the administrative bureaucracy, appointing inexperienced contractors and Incompetent design team, Inadequate early planning, absence of transparency, and limited competition. Finally, appropriate strategic steps identified to carry out an effective e-procurement system in public construction projects. 2019 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf Alwaely, Ammar Mohammed Oda (2019) Strategy of minimizing delay in public construction projects through implementation of electronic procurement system. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134378
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Alwaely, Ammar Mohammed Oda
Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
description Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this study is outline the strategy of minimizing delays through implementation of electronic-procurement system in public construction projects. There are three objectives to achieve this aim. First, determining the relation of procurement systems used with the delay factors. Second, determining the contribution of e-procurement systems in minimizing delays. Third, suggesting an appropriate strategy to assist in carrying out an effective e-procurement system for public construction projects. These objectives were achieved through an intensive literature review and a survey which included a questionnaire used to assess the perceptions of the main participants involved in the construction projects. Interviews conducted with experts to validate the questionnaire form before distributing. The questionnaire was divided into three sections. The main section focused on the causes of delay, which related to procurement system. The 34 causes compiled through the literature review and the interview with experts were classified into four groups according to phase related. Answers collected from 53 respondents representing the parties involved in the construction projects. Data collected was analysed quantitatively and ranked through the Statistical Package for the Social Sciences (SPSS) to identify the significant effects of the procurement system on the delay. It was concluded that the most effective delay factors related to procurement system in Iraq are: the administrative bureaucracy, appointing inexperienced contractors and Incompetent design team, Inadequate early planning, absence of transparency, and limited competition. Finally, appropriate strategic steps identified to carry out an effective e-procurement system in public construction projects.
format Thesis
author Alwaely, Ammar Mohammed Oda
author_facet Alwaely, Ammar Mohammed Oda
author_sort Alwaely, Ammar Mohammed Oda
title Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_short Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_full Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_fullStr Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_full_unstemmed Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_sort strategy of minimizing delay in public construction projects through implementation of electronic procurement system
publishDate 2019
url http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf
http://eprints.utm.my/id/eprint/92756/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134378
_version_ 1715189685422129152
score 13.160551