Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction pr...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf http://eprints.utm.my/id/eprint/92525/ http://dx.doi.org/10.1088/1755-1315/476/1/012009 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.92525 |
---|---|
record_format |
eprints |
spelling |
my.utm.925252021-09-30T15:14:28Z http://eprints.utm.my/id/eprint/92525/ Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building Kermanshahi, Emad Kasra Md. Tahir, Mahmood Abdul Shukor Lim, Nor Hasanah Balasbaneh, Ali Tighnavard Roshanghalb, Shervin TA Engineering (General). Civil engineering (General) The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building. 2020 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf Kermanshahi, Emad Kasra and Md. Tahir, Mahmood and Abdul Shukor Lim, Nor Hasanah and Balasbaneh, Ali Tighnavard and Roshanghalb, Shervin (2020) Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building. In: 2nd International Conference on Civil and Environmental Engineering, CENVIRON 2019, 20 - 21 November 2019, Langkawi, Kedah. http://dx.doi.org/10.1088/1755-1315/476/1/012009 |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Kermanshahi, Emad Kasra Md. Tahir, Mahmood Abdul Shukor Lim, Nor Hasanah Balasbaneh, Ali Tighnavard Roshanghalb, Shervin Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
description |
The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building. |
format |
Conference or Workshop Item |
author |
Kermanshahi, Emad Kasra Md. Tahir, Mahmood Abdul Shukor Lim, Nor Hasanah Balasbaneh, Ali Tighnavard Roshanghalb, Shervin |
author_facet |
Kermanshahi, Emad Kasra Md. Tahir, Mahmood Abdul Shukor Lim, Nor Hasanah Balasbaneh, Ali Tighnavard Roshanghalb, Shervin |
author_sort |
Kermanshahi, Emad Kasra |
title |
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
title_short |
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
title_full |
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
title_fullStr |
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
title_full_unstemmed |
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building |
title_sort |
implementation of building information modeling for construction clash detection process in the design stage: a case study of malaysian police headquarter building |
publishDate |
2020 |
url |
http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf http://eprints.utm.my/id/eprint/92525/ http://dx.doi.org/10.1088/1755-1315/476/1/012009 |
_version_ |
1713199744662110208 |
score |
13.211869 |