Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building

The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction pr...

Full description

Saved in:
Bibliographic Details
Main Authors: Kermanshahi, Emad Kasra, Md. Tahir, Mahmood, Abdul Shukor Lim, Nor Hasanah, Balasbaneh, Ali Tighnavard, Roshanghalb, Shervin
Format: Conference or Workshop Item
Language:English
Published: 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf
http://eprints.utm.my/id/eprint/92525/
http://dx.doi.org/10.1088/1755-1315/476/1/012009
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.92525
record_format eprints
spelling my.utm.925252021-09-30T15:14:28Z http://eprints.utm.my/id/eprint/92525/ Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building Kermanshahi, Emad Kasra Md. Tahir, Mahmood Abdul Shukor Lim, Nor Hasanah Balasbaneh, Ali Tighnavard Roshanghalb, Shervin TA Engineering (General). Civil engineering (General) The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building. 2020 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf Kermanshahi, Emad Kasra and Md. Tahir, Mahmood and Abdul Shukor Lim, Nor Hasanah and Balasbaneh, Ali Tighnavard and Roshanghalb, Shervin (2020) Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building. In: 2nd International Conference on Civil and Environmental Engineering, CENVIRON 2019, 20 - 21 November 2019, Langkawi, Kedah. http://dx.doi.org/10.1088/1755-1315/476/1/012009
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Kermanshahi, Emad Kasra
Md. Tahir, Mahmood
Abdul Shukor Lim, Nor Hasanah
Balasbaneh, Ali Tighnavard
Roshanghalb, Shervin
Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
description The Malaysian government motivates constructor companies to use Building Information Modeling (BIM) on their projects because it can dominate problems such as design error, delay, and construction-overrun costs. This research also assesses the effect of BIM in the design phase of the construction process and how this technology can detect all existing clash in construction plans during the design phase. The research was carried out through a case study that contains an architectural, structural, and Mechanical, Electrical and Plumbing (MEP) BIM models and their following clash detection. The current study implemented Autodesk Revit and Autodesk Navisworks Manage as BIM tools to develop features to simplify and automatically clash detection process. The result from the case study analysis revealed that BIM is an appropriate tool for detecting clashes among the building elements. Therefore, constructability issues can be determined earlier during the design phase before the construction phase begins, controlling project cost, time, and having a seamless design to produce a better building.
format Conference or Workshop Item
author Kermanshahi, Emad Kasra
Md. Tahir, Mahmood
Abdul Shukor Lim, Nor Hasanah
Balasbaneh, Ali Tighnavard
Roshanghalb, Shervin
author_facet Kermanshahi, Emad Kasra
Md. Tahir, Mahmood
Abdul Shukor Lim, Nor Hasanah
Balasbaneh, Ali Tighnavard
Roshanghalb, Shervin
author_sort Kermanshahi, Emad Kasra
title Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
title_short Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
title_full Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
title_fullStr Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
title_full_unstemmed Implementation of building information modeling for construction clash detection process in the design stage: A case study of Malaysian police headquarter building
title_sort implementation of building information modeling for construction clash detection process in the design stage: a case study of malaysian police headquarter building
publishDate 2020
url http://eprints.utm.my/id/eprint/92525/1/MahmoodMdTahir2020_ImplementationofBuildingInformationModelingforConstructionClash.pdf
http://eprints.utm.my/id/eprint/92525/
http://dx.doi.org/10.1088/1755-1315/476/1/012009
_version_ 1713199744662110208
score 13.211869