The framework of competency facilities manager in pre-construction hospital in Malaysia

This paper distinguishes was conducted on the importance of the facility mnager's competence for a complex construction project such as hospital construction. There is thus a need to study the competence of facilities managers at the level of hospital construction. Directly, the involvement of...

Full description

Saved in:
Bibliographic Details
Main Authors: Jenuwa, Norsyazwana, Misnan, Mohd. Saidin, Abdullah, Mat Naim
Format: Article
Published: Blue Eyes Intelligence Engineering 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/90837/
https://www.ijeat.org/download/volume-9-issue-3/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.90837
record_format eprints
spelling my.utm.908372021-05-31T13:21:59Z http://eprints.utm.my/id/eprint/90837/ The framework of competency facilities manager in pre-construction hospital in Malaysia Jenuwa, Norsyazwana Misnan, Mohd. Saidin Abdullah, Mat Naim HD28 Management. Industrial Management This paper distinguishes was conducted on the importance of the facility mnager's competence for a complex construction project such as hospital construction. There is thus a need to study the competence of facilities managers at the level of hospital construction. Directly, the involvement of the facility manager at the construction stage can reduce the cost of operating the building. This paper study was carried out using two methods, namely questionnaire method and interview method. The study involved the construction of architects, engineers, quantity surveyors, public hospital staff and facilities managers directly involved in the construction of public hospitals in Malaysia. The data obtained were analyzed using descriptive analysis techniques, relative value index (RII) and analysis using SEM Smart PLS method. The findings found that almost all respondents felt that leadership factors, communication factors, operating and maintenance factors, human factors, property and property management factors, and business preparedness and business balance factors were factors influencing facility manager competence at the construction stage. Blue Eyes Intelligence Engineering 2020 Article PeerReviewed Jenuwa, Norsyazwana and Misnan, Mohd. Saidin and Abdullah, Mat Naim (2020) The framework of competency facilities manager in pre-construction hospital in Malaysia. International Journal Of Engineering And Advanced Technology (IJEAT)., 9 (3). pp. 3949-3952. ISSN 2249-8958 https://www.ijeat.org/download/volume-9-issue-3/
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Jenuwa, Norsyazwana
Misnan, Mohd. Saidin
Abdullah, Mat Naim
The framework of competency facilities manager in pre-construction hospital in Malaysia
description This paper distinguishes was conducted on the importance of the facility mnager's competence for a complex construction project such as hospital construction. There is thus a need to study the competence of facilities managers at the level of hospital construction. Directly, the involvement of the facility manager at the construction stage can reduce the cost of operating the building. This paper study was carried out using two methods, namely questionnaire method and interview method. The study involved the construction of architects, engineers, quantity surveyors, public hospital staff and facilities managers directly involved in the construction of public hospitals in Malaysia. The data obtained were analyzed using descriptive analysis techniques, relative value index (RII) and analysis using SEM Smart PLS method. The findings found that almost all respondents felt that leadership factors, communication factors, operating and maintenance factors, human factors, property and property management factors, and business preparedness and business balance factors were factors influencing facility manager competence at the construction stage.
format Article
author Jenuwa, Norsyazwana
Misnan, Mohd. Saidin
Abdullah, Mat Naim
author_facet Jenuwa, Norsyazwana
Misnan, Mohd. Saidin
Abdullah, Mat Naim
author_sort Jenuwa, Norsyazwana
title The framework of competency facilities manager in pre-construction hospital in Malaysia
title_short The framework of competency facilities manager in pre-construction hospital in Malaysia
title_full The framework of competency facilities manager in pre-construction hospital in Malaysia
title_fullStr The framework of competency facilities manager in pre-construction hospital in Malaysia
title_full_unstemmed The framework of competency facilities manager in pre-construction hospital in Malaysia
title_sort framework of competency facilities manager in pre-construction hospital in malaysia
publisher Blue Eyes Intelligence Engineering
publishDate 2020
url http://eprints.utm.my/id/eprint/90837/
https://www.ijeat.org/download/volume-9-issue-3/
_version_ 1702169608737259520
score 13.159267