Time cost model for water related projects
Planning is one of the elements of management, next to organizing, motivating and control. It draws attention to the determinants and characteristics of the planning part and its particular importance in the project management process. Assessing the accuracy of the project timeline should be conside...
Saved in:
Main Author: | Ahmad, Siti Farida |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/87004/1/SitiFaridaAhmadMSKA2020.pdf http://eprints.utm.my/id/eprint/87004/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134201 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Review on Uncertainties Causing Time and Cost
Overrun in Construction Projects
by: B. Idrus, Arazi, et al.
Published: (2011) -
CRITICAL SUCCESS FACTORS AFFECTING QUALITY, COST
AND TIME CONTROL IN CONSTRUCTION PROJECTS
by: SAMSURI, AIN SYAFINAZ
Published: (2017) -
Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects
by: C.T, Ramanathan, et al.
Published: (2014) -
Case study and Survey on Time and Cost
overrun of Multiple D&B Projects
by: Sambu Potty, Narayanan, et al.
Published: (2011) -
Strategies model of time performance for flood mitigation projects
by: Zakaria, Siti Fairus
Published: (2020)