A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs

Flexible ramping products (flexiramp), provided by entitled resources to meet net demand forecast error, are the underpinning for the accommodation of the substantial uncertainties associated with variable wind power. This paper proposes an enhanced flexiramp modeling approach, cast in a hybrid stoc...

Full description

Saved in:
Bibliographic Details
Main Authors: Shaaban, Mohamed, Tan, W. S., Abdullah, Md. Pauzi
Format: Article
Published: Elsevier Ltd 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/86506/
http://dx.doi.org/10.1016/j.ijepes.2018.02.004
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.86506
record_format eprints
spelling my.utm.865062020-09-30T08:41:14Z http://eprints.utm.my/id/eprint/86506/ A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs Shaaban, Mohamed Tan, W. S. Abdullah, Md. Pauzi TK Electrical engineering. Electronics Nuclear engineering Flexible ramping products (flexiramp), provided by entitled resources to meet net demand forecast error, are the underpinning for the accommodation of the substantial uncertainties associated with variable wind power. This paper proposes an enhanced flexiramp modeling approach, cast in a hybrid stochastic/deterministic multi-timescale framework. The framework employs a chance-constrained day-ahead scheduling method, as well as deterministic scheduling on intra-hourly basis (real-time scheduling), to allow optimal procurement planning of the flexiramp products in both timescales. A stepwise and piecewise demand price curve is also proposed to calculate the flexiramp surplus procurement price. Non-generation resource (NGR), referring to energy storage, is implemented to provide extra flexibility. Additionally, cycling ramping cost (cycliramp), introduced to model operational and maintenance costs and reduce the wear and tear of generators, is also included as a penalty. Numerical tests are conducted on 6-bus and 118-bus systems. Results demonstrate the merits of the proposed scheduling model as well as the effects of flexiramp and cycliramp costs in the multi-timescale scheduling. Elsevier Ltd 2018-07 Article PeerReviewed Shaaban, Mohamed and Tan, W. S. and Abdullah, Md. Pauzi (2018) A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs. International Journal of Electrical Power and Energy Systems, 99 . pp. 585-593. ISSN 0142-0615 http://dx.doi.org/10.1016/j.ijepes.2018.02.004
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Shaaban, Mohamed
Tan, W. S.
Abdullah, Md. Pauzi
A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
description Flexible ramping products (flexiramp), provided by entitled resources to meet net demand forecast error, are the underpinning for the accommodation of the substantial uncertainties associated with variable wind power. This paper proposes an enhanced flexiramp modeling approach, cast in a hybrid stochastic/deterministic multi-timescale framework. The framework employs a chance-constrained day-ahead scheduling method, as well as deterministic scheduling on intra-hourly basis (real-time scheduling), to allow optimal procurement planning of the flexiramp products in both timescales. A stepwise and piecewise demand price curve is also proposed to calculate the flexiramp surplus procurement price. Non-generation resource (NGR), referring to energy storage, is implemented to provide extra flexibility. Additionally, cycling ramping cost (cycliramp), introduced to model operational and maintenance costs and reduce the wear and tear of generators, is also included as a penalty. Numerical tests are conducted on 6-bus and 118-bus systems. Results demonstrate the merits of the proposed scheduling model as well as the effects of flexiramp and cycliramp costs in the multi-timescale scheduling.
format Article
author Shaaban, Mohamed
Tan, W. S.
Abdullah, Md. Pauzi
author_facet Shaaban, Mohamed
Tan, W. S.
Abdullah, Md. Pauzi
author_sort Shaaban, Mohamed
title A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
title_short A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
title_full A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
title_fullStr A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
title_full_unstemmed A multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
title_sort multi-timescale hybrid stochastic/deterministic generation scheduling framework with flexiramp and cycliramp costs
publisher Elsevier Ltd
publishDate 2018
url http://eprints.utm.my/id/eprint/86506/
http://dx.doi.org/10.1016/j.ijepes.2018.02.004
_version_ 1680321056478330880
score 13.160551