Optimal design and scheduling of an integrated centralized and decentralized energy generation system

Most electricity worldwide is supplied from the established centralized energy generation (CEG) system network which mainly operates using fossil fuels. An alternative decentralized energy generation (DEG) system has emerged with the advantage of generating electricity from locally available resourc...

Full description

Saved in:
Bibliographic Details
Main Author: Liu, Wen Hui
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/85920/1/LiuWenHuiPSchE2019.pdf
http://eprints.utm.my/id/eprint/85920/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131622
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.85920
record_format eprints
spelling my.utm.859202020-07-30T07:38:36Z http://eprints.utm.my/id/eprint/85920/ Optimal design and scheduling of an integrated centralized and decentralized energy generation system Liu, Wen Hui TP Chemical technology Most electricity worldwide is supplied from the established centralized energy generation (CEG) system network which mainly operates using fossil fuels. An alternative decentralized energy generation (DEG) system has emerged with the advantage of generating electricity from locally available resources (usually renewable energy) for local consumption. DEG systems could avoid significant power losses during transmission in the CEG network and reduce the reliance on fossil fuels. These DEGs however, are geographically scattered and their resources are intermittent. One notable problem is that, at one point of time, some DEGs may have excess electricity and some may have electricity deficits; depending on the resource availability and the electricity consumption pattern. Weather-depending resources such as solar and wind energy could also affect the system’s reliability. The energy gaps between one DEG to another can be solved, provided that the DEGs are integrated at the distribution level whereas the reliability issue can be overcome by integrating multiple DEGs to the existing CEG (which has a more stable electricity supply) at the transmission level. To deploy this complex integrated energy system, key decision parameters such as selection of technologies and their capacities, interactions between different units, overall system efficiency and costing at their optimum level have to be determined. There are limited studies in the literature regarding the wide-scale integration of DEGs with CEG and a lack of comprehensive optimization approach to solve for the system’s design and scheduling. To fill these gaps, this research aimed to develop a novel targeting and optimization methodology for the design and scheduling of the DEG-CEG integrated energy system. A new numerical DEG-CEG integration framework was developed based on two enhanced Power Pinch approaches: (i) Extended Power Pinch Analysis for on-grid DEG system, and (ii) Extended Electrical Power System Cascade Analysis for CEG system with generation flexibility. The numerical framework optimized only the system’s energy efficiency. A mixed integer nonlinear programming (MINLP) model was then developed to study the DEG-CEG system more holistically in terms of energy efficiency and costing, as well as to validate the optimal solutions resulted from the numerical framework. Both approaches were demonstrated using a hypothetical case study – an integrated energy system with multiple DEGs (operating using solar, wind and biomass energy) at different locations connected to one CEG (operating using natural gas) to fulfil power demand from residential, commercial and industrial sectors. From energy-efficient aspect, the numerical framework resulted in the system operating at an efficiency of 77 %, while the MINLP model showed 80.7 %. The difference of 3.7 % confirms the relevance of the numerical DEG-CEG integration framework as a systematic and effective energy planning tool in solving the design and scheduling problems of a power system. In term of costing, the MINLP model revealed that the system can achieve 77 % with a total cost of RM 936 million/y. Nevertheless, the numerical method is still an important analytical tool as the analysis provides visual insights that can be easily understood and appreciated by users like energy engineers and policymakers. 2019 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/85920/1/LiuWenHuiPSchE2019.pdf Liu, Wen Hui (2019) Optimal design and scheduling of an integrated centralized and decentralized energy generation system. PhD thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Chemical & Energy Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131622
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
Liu, Wen Hui
Optimal design and scheduling of an integrated centralized and decentralized energy generation system
description Most electricity worldwide is supplied from the established centralized energy generation (CEG) system network which mainly operates using fossil fuels. An alternative decentralized energy generation (DEG) system has emerged with the advantage of generating electricity from locally available resources (usually renewable energy) for local consumption. DEG systems could avoid significant power losses during transmission in the CEG network and reduce the reliance on fossil fuels. These DEGs however, are geographically scattered and their resources are intermittent. One notable problem is that, at one point of time, some DEGs may have excess electricity and some may have electricity deficits; depending on the resource availability and the electricity consumption pattern. Weather-depending resources such as solar and wind energy could also affect the system’s reliability. The energy gaps between one DEG to another can be solved, provided that the DEGs are integrated at the distribution level whereas the reliability issue can be overcome by integrating multiple DEGs to the existing CEG (which has a more stable electricity supply) at the transmission level. To deploy this complex integrated energy system, key decision parameters such as selection of technologies and their capacities, interactions between different units, overall system efficiency and costing at their optimum level have to be determined. There are limited studies in the literature regarding the wide-scale integration of DEGs with CEG and a lack of comprehensive optimization approach to solve for the system’s design and scheduling. To fill these gaps, this research aimed to develop a novel targeting and optimization methodology for the design and scheduling of the DEG-CEG integrated energy system. A new numerical DEG-CEG integration framework was developed based on two enhanced Power Pinch approaches: (i) Extended Power Pinch Analysis for on-grid DEG system, and (ii) Extended Electrical Power System Cascade Analysis for CEG system with generation flexibility. The numerical framework optimized only the system’s energy efficiency. A mixed integer nonlinear programming (MINLP) model was then developed to study the DEG-CEG system more holistically in terms of energy efficiency and costing, as well as to validate the optimal solutions resulted from the numerical framework. Both approaches were demonstrated using a hypothetical case study – an integrated energy system with multiple DEGs (operating using solar, wind and biomass energy) at different locations connected to one CEG (operating using natural gas) to fulfil power demand from residential, commercial and industrial sectors. From energy-efficient aspect, the numerical framework resulted in the system operating at an efficiency of 77 %, while the MINLP model showed 80.7 %. The difference of 3.7 % confirms the relevance of the numerical DEG-CEG integration framework as a systematic and effective energy planning tool in solving the design and scheduling problems of a power system. In term of costing, the MINLP model revealed that the system can achieve 77 % with a total cost of RM 936 million/y. Nevertheless, the numerical method is still an important analytical tool as the analysis provides visual insights that can be easily understood and appreciated by users like energy engineers and policymakers.
format Thesis
author Liu, Wen Hui
author_facet Liu, Wen Hui
author_sort Liu, Wen Hui
title Optimal design and scheduling of an integrated centralized and decentralized energy generation system
title_short Optimal design and scheduling of an integrated centralized and decentralized energy generation system
title_full Optimal design and scheduling of an integrated centralized and decentralized energy generation system
title_fullStr Optimal design and scheduling of an integrated centralized and decentralized energy generation system
title_full_unstemmed Optimal design and scheduling of an integrated centralized and decentralized energy generation system
title_sort optimal design and scheduling of an integrated centralized and decentralized energy generation system
publishDate 2019
url http://eprints.utm.my/id/eprint/85920/1/LiuWenHuiPSchE2019.pdf
http://eprints.utm.my/id/eprint/85920/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:131622
_version_ 1674066227794804736
score 13.211853