A case study of LEAN application for shortest lead time in composite repair shop

Lean tools and applications have been adopted globally by many companies and industries such as automotive, aerospace, healthcare, pharmaceutical, shipbuilding, public services, project management and several others. The most basic of lean tools can be distinguished by the following: Value Stream Ma...

Full description

Saved in:
Bibliographic Details
Main Authors: Ishak, Fadzil Adly, Johari, Muhd. Khudri, Dolah, Rozzeta
Format: Article
Language:English
Published: Science Publishing Corporation Inc. 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/85249/1/RozzetaDolah2018_ACaseStudyofLEANApplicationforShortest.pdf
http://eprints.utm.my/id/eprint/85249/
http://dx.doi.org/10.14419/ijet.v7i4.13.21341
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.85249
record_format eprints
spelling my.utm.852492020-03-17T08:01:49Z http://eprints.utm.my/id/eprint/85249/ A case study of LEAN application for shortest lead time in composite repair shop Ishak, Fadzil Adly Johari, Muhd. Khudri Dolah, Rozzeta T Technology (General) Lean tools and applications have been adopted globally by many companies and industries such as automotive, aerospace, healthcare, pharmaceutical, shipbuilding, public services, project management and several others. The most basic of lean tools can be distinguished by the following: Value Stream Mapping (VSM), 5S and Kaizen, and many have agreed that these are the best selections in the initial approach of lean system and these techniques are part of the Y Management System (YMS) initiatives. This research is intended to make VSM as the primary working culture, which has been proven suitable to the servicing companies that conduct Maintenance, Repair and Overhaul (MRO) activities. With full cooperation from Company X Sdn. Bhd., researchers were able to review and later harmonize the implementation flow of VSM with the intentions to increase their personnel’s production rate significantly. The rudder repair project involving the maintenance of Royal Military Airforce’s Skyhawk aircraft has been given the opportunity to be experimented with VSM. After the analysis of all 53 personnel involved, it can be concluded that the lean implementation has considerably improved their individual performances, organizational behaviours, future work mapping and personal/team workstations. Science Publishing Corporation Inc. 2018 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/85249/1/RozzetaDolah2018_ACaseStudyofLEANApplicationforShortest.pdf Ishak, Fadzil Adly and Johari, Muhd. Khudri and Dolah, Rozzeta (2018) A case study of LEAN application for shortest lead time in composite repair shop. International Journal of Engineering & Technology, 7 (4.13). pp. 112-119. ISSN 2227-524X http://dx.doi.org/10.14419/ijet.v7i4.13.21341 DOI:10.14419/ijet.v7i4.13.21341
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Ishak, Fadzil Adly
Johari, Muhd. Khudri
Dolah, Rozzeta
A case study of LEAN application for shortest lead time in composite repair shop
description Lean tools and applications have been adopted globally by many companies and industries such as automotive, aerospace, healthcare, pharmaceutical, shipbuilding, public services, project management and several others. The most basic of lean tools can be distinguished by the following: Value Stream Mapping (VSM), 5S and Kaizen, and many have agreed that these are the best selections in the initial approach of lean system and these techniques are part of the Y Management System (YMS) initiatives. This research is intended to make VSM as the primary working culture, which has been proven suitable to the servicing companies that conduct Maintenance, Repair and Overhaul (MRO) activities. With full cooperation from Company X Sdn. Bhd., researchers were able to review and later harmonize the implementation flow of VSM with the intentions to increase their personnel’s production rate significantly. The rudder repair project involving the maintenance of Royal Military Airforce’s Skyhawk aircraft has been given the opportunity to be experimented with VSM. After the analysis of all 53 personnel involved, it can be concluded that the lean implementation has considerably improved their individual performances, organizational behaviours, future work mapping and personal/team workstations.
format Article
author Ishak, Fadzil Adly
Johari, Muhd. Khudri
Dolah, Rozzeta
author_facet Ishak, Fadzil Adly
Johari, Muhd. Khudri
Dolah, Rozzeta
author_sort Ishak, Fadzil Adly
title A case study of LEAN application for shortest lead time in composite repair shop
title_short A case study of LEAN application for shortest lead time in composite repair shop
title_full A case study of LEAN application for shortest lead time in composite repair shop
title_fullStr A case study of LEAN application for shortest lead time in composite repair shop
title_full_unstemmed A case study of LEAN application for shortest lead time in composite repair shop
title_sort case study of lean application for shortest lead time in composite repair shop
publisher Science Publishing Corporation Inc.
publishDate 2018
url http://eprints.utm.my/id/eprint/85249/1/RozzetaDolah2018_ACaseStudyofLEANApplicationforShortest.pdf
http://eprints.utm.my/id/eprint/85249/
http://dx.doi.org/10.14419/ijet.v7i4.13.21341
_version_ 1662754372715544576
score 13.211869