Issues of using function point analysis method for requirement changes during software development phase

Software go through changes at all stages of Software Development Life Cycle (SDLC). Accepting a large amount of changes may raise the time and cost of the software. While denying changes may rise customer dissatisfaction. An effective change acceptance decision helps software project manager to dec...

Full description

Saved in:
Bibliographic Details
Main Authors: Shah, Jalal, Kama, Nazri
Format: Conference or Workshop Item
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81872/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.81872
record_format eprints
spelling my.utm.818722019-09-29T10:54:16Z http://eprints.utm.my/id/eprint/81872/ Issues of using function point analysis method for requirement changes during software development phase Shah, Jalal Kama, Nazri QA75 Electronic computers. Computer science Software go through changes at all stages of Software Development Life Cycle (SDLC). Accepting a large amount of changes may raise the time and cost of the software. While denying changes may rise customer dissatisfaction. An effective change acceptance decision helps software project manager to decide whether to accept or reject these changes. Software effort estimation is one of the methods that helps software project manager in an efficient change acceptance decision. Several software effort estimation techniques have been introduced to date and Function Point Analysis (FPA) is one of them. FPA method is used for measuring the size and complexity of a software by calculating the functionality that the system provides its user. Many studies highlighted that FPA method is used for early phases of SDLC as compared to software development phase. During software development phase software artifacts are in inconsistent states. Therefore, it is a challenging task for software project manager to estimate the amount of required effort for a change request during software development phase. In this paper we have used FPA method in a case study for requirement changes during software development phase. This study has highlighted the main concerns of using FPA method for requirement changes during software development phase. 2018 Conference or Workshop Item PeerReviewed Shah, Jalal and Kama, Nazri (2018) Issues of using function point analysis method for requirement changes during software development phase. In: 4th Symposium on Asia-Pacific Requirements Engineering Symposium, APRES 2017, 9 November 2017 through 10 November 2017, Melaka, Malaysia.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic QA75 Electronic computers. Computer science
spellingShingle QA75 Electronic computers. Computer science
Shah, Jalal
Kama, Nazri
Issues of using function point analysis method for requirement changes during software development phase
description Software go through changes at all stages of Software Development Life Cycle (SDLC). Accepting a large amount of changes may raise the time and cost of the software. While denying changes may rise customer dissatisfaction. An effective change acceptance decision helps software project manager to decide whether to accept or reject these changes. Software effort estimation is one of the methods that helps software project manager in an efficient change acceptance decision. Several software effort estimation techniques have been introduced to date and Function Point Analysis (FPA) is one of them. FPA method is used for measuring the size and complexity of a software by calculating the functionality that the system provides its user. Many studies highlighted that FPA method is used for early phases of SDLC as compared to software development phase. During software development phase software artifacts are in inconsistent states. Therefore, it is a challenging task for software project manager to estimate the amount of required effort for a change request during software development phase. In this paper we have used FPA method in a case study for requirement changes during software development phase. This study has highlighted the main concerns of using FPA method for requirement changes during software development phase.
format Conference or Workshop Item
author Shah, Jalal
Kama, Nazri
author_facet Shah, Jalal
Kama, Nazri
author_sort Shah, Jalal
title Issues of using function point analysis method for requirement changes during software development phase
title_short Issues of using function point analysis method for requirement changes during software development phase
title_full Issues of using function point analysis method for requirement changes during software development phase
title_fullStr Issues of using function point analysis method for requirement changes during software development phase
title_full_unstemmed Issues of using function point analysis method for requirement changes during software development phase
title_sort issues of using function point analysis method for requirement changes during software development phase
publishDate 2018
url http://eprints.utm.my/id/eprint/81872/
_version_ 1651866373792464896
score 13.19449