Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry

A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule wer...

Full description

Saved in:
Bibliographic Details
Main Authors: Nik Mohamed, Nik Mohd. Zuki, Hasan Yudie Sastra, Hasan Yudie Sastra, Salit, Mohd. Sapuan, Ismail, Napsiah, Arora, Prithivi Raj, Abdul Hamid, Abu Bakar
Format: Article
Language:English
Published: Faculty of Management and Human Resource Development, UTM 2004
Subjects:
Online Access:http://eprints.utm.my/id/eprint/8176/1/NikMohdZuki2004_VendorInvolvementandConcurrentEngineering.pdf
http://eprints.utm.my/id/eprint/8176/
http://www.management.utm.my/download/jurnal-kemanusiaan/bil-04-dis-2004/89-vendor-involvement-and-concurrent-engineering-methods-in-reducing-development-time-for-new-model.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.8176
record_format eprints
spelling my.utm.81762017-05-30T06:53:40Z http://eprints.utm.my/id/eprint/8176/ Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry Nik Mohamed, Nik Mohd. Zuki Hasan Yudie Sastra, Hasan Yudie Sastra Salit, Mohd. Sapuan Ismail, Napsiah Arora, Prithivi Raj Abdul Hamid, Abu Bakar H Social Sciences (General) QA Mathematics A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule were not officially endorsed by all related departmental heads, which resulted in too ambitious and unrealistic schedules. Other problem includes lack of comprehensive market research to gauge the car implementation timing, styling and manufacturing trend in the process of project planning. It was also found that benchmarking exercise was carried out on already released product and for future product. The study suggested various ways for method improvement such as through effective benchmarking process, audit of vendor capability, excellent computer facility, official endorsement of project planning and master schedule by related departmental heads and comprehensive market research Faculty of Management and Human Resource Development, UTM 2004-12 Article PeerReviewed application/pdf en http://eprints.utm.my/id/eprint/8176/1/NikMohdZuki2004_VendorInvolvementandConcurrentEngineering.pdf Nik Mohamed, Nik Mohd. Zuki and Hasan Yudie Sastra, Hasan Yudie Sastra and Salit, Mohd. Sapuan and Ismail, Napsiah and Arora, Prithivi Raj and Abdul Hamid, Abu Bakar (2004) Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry. Jurnal Kemanusiaan (4). pp. 17-23. ISSN 1675-1930 http://www.management.utm.my/download/jurnal-kemanusiaan/bil-04-dis-2004/89-vendor-involvement-and-concurrent-engineering-methods-in-reducing-development-time-for-new-model.html
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic H Social Sciences (General)
QA Mathematics
spellingShingle H Social Sciences (General)
QA Mathematics
Nik Mohamed, Nik Mohd. Zuki
Hasan Yudie Sastra, Hasan Yudie Sastra
Salit, Mohd. Sapuan
Ismail, Napsiah
Arora, Prithivi Raj
Abdul Hamid, Abu Bakar
Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
description A study of method improvement to reduce development time for new model in automotive industry is presented in this paper. The approach taken is by studying the existing practice in car development. It was found that in the current practice of car development, project planning and master schedule were not officially endorsed by all related departmental heads, which resulted in too ambitious and unrealistic schedules. Other problem includes lack of comprehensive market research to gauge the car implementation timing, styling and manufacturing trend in the process of project planning. It was also found that benchmarking exercise was carried out on already released product and for future product. The study suggested various ways for method improvement such as through effective benchmarking process, audit of vendor capability, excellent computer facility, official endorsement of project planning and master schedule by related departmental heads and comprehensive market research
format Article
author Nik Mohamed, Nik Mohd. Zuki
Hasan Yudie Sastra, Hasan Yudie Sastra
Salit, Mohd. Sapuan
Ismail, Napsiah
Arora, Prithivi Raj
Abdul Hamid, Abu Bakar
author_facet Nik Mohamed, Nik Mohd. Zuki
Hasan Yudie Sastra, Hasan Yudie Sastra
Salit, Mohd. Sapuan
Ismail, Napsiah
Arora, Prithivi Raj
Abdul Hamid, Abu Bakar
author_sort Nik Mohamed, Nik Mohd. Zuki
title Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
title_short Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
title_full Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
title_fullStr Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
title_full_unstemmed Vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
title_sort vendor involvement and concurrent engineering : methods in reducing development time for new model in automotive industry
publisher Faculty of Management and Human Resource Development, UTM
publishDate 2004
url http://eprints.utm.my/id/eprint/8176/1/NikMohdZuki2004_VendorInvolvementandConcurrentEngineering.pdf
http://eprints.utm.my/id/eprint/8176/
http://www.management.utm.my/download/jurnal-kemanusiaan/bil-04-dis-2004/89-vendor-involvement-and-concurrent-engineering-methods-in-reducing-development-time-for-new-model.html
_version_ 1643644934837764096
score 13.2014675