Risk management of design and build project

Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contr...

Full description

Saved in:
Bibliographic Details
Main Author: Amat Bakri, Nurul Khalida
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf
http://eprints.utm.my/id/eprint/81455/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125203
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.81455
record_format eprints
spelling my.utm.814552019-08-23T05:18:50Z http://eprints.utm.my/id/eprint/81455/ Risk management of design and build project Amat Bakri, Nurul Khalida TA Engineering (General). Civil engineering (General) Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contractor that shall responsible for both design and construction of project. Despite this advantage, design and build project can be very risky to both of owner and contractor. Therefore, this study has been conducted to carry out risk assessment on the design and build approach. This study commenced with the project identification of risks that are adopt for design and build approach. Next, risk analysis has been carried out to evaluate the impact of risk to project cost, duration and quality. The methodology used to carry out this study are by means of literature review study, interviews with industry experts and conducting questionnaire survey. The result from this study has enabled the risk to be classified into low, medium and high classification. Apart from that, this study also proposed risk mitigation strategies for the project that are categorised as highrisk item. Finally, it is hope that the findings from this study will be able to provide some insight for those who are implementing the design and build project. 2019 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf Amat Bakri, Nurul Khalida (2019) Risk management of design and build project. Masters thesis, Universiti Teknologi Malaysia. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125203
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Amat Bakri, Nurul Khalida
Risk management of design and build project
description Design and build procurement method offer an alternative contracting route apart from traditional method. The significance advantage of design and build procurement method is it provides the client with single management point. With this contracting arrangement, client requires to appoint main contractor that shall responsible for both design and construction of project. Despite this advantage, design and build project can be very risky to both of owner and contractor. Therefore, this study has been conducted to carry out risk assessment on the design and build approach. This study commenced with the project identification of risks that are adopt for design and build approach. Next, risk analysis has been carried out to evaluate the impact of risk to project cost, duration and quality. The methodology used to carry out this study are by means of literature review study, interviews with industry experts and conducting questionnaire survey. The result from this study has enabled the risk to be classified into low, medium and high classification. Apart from that, this study also proposed risk mitigation strategies for the project that are categorised as highrisk item. Finally, it is hope that the findings from this study will be able to provide some insight for those who are implementing the design and build project.
format Thesis
author Amat Bakri, Nurul Khalida
author_facet Amat Bakri, Nurul Khalida
author_sort Amat Bakri, Nurul Khalida
title Risk management of design and build project
title_short Risk management of design and build project
title_full Risk management of design and build project
title_fullStr Risk management of design and build project
title_full_unstemmed Risk management of design and build project
title_sort risk management of design and build project
publishDate 2019
url http://eprints.utm.my/id/eprint/81455/1/NurulKhalidaAmatMSKA2019.pdf
http://eprints.utm.my/id/eprint/81455/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:125203
_version_ 1643658715692269568
score 13.160551