A study of best practice of scheduled outage program in increasing plant performance

The purpose of this study is to determine solution in meeting high expectation from plant owner to the one and only asset in Malaysia of thermal type coal-fired power plant, Chinese Group of Nuclear (CGN) through Malaysian local company EDRA Power Holdings Sdn Bhd has challenged Jimah power plant to...

Full description

Saved in:
Bibliographic Details
Main Author: Othman, Faiz Maniza
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://eprints.utm.my/id/eprint/80965/1/FaizManizOthmanMSKA2018.pdf
http://eprints.utm.my/id/eprint/80965/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:124977
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.80965
record_format eprints
spelling my.utm.809652019-07-24T00:13:29Z http://eprints.utm.my/id/eprint/80965/ A study of best practice of scheduled outage program in increasing plant performance Othman, Faiz Maniza TA Engineering (General). Civil engineering (General) The purpose of this study is to determine solution in meeting high expectation from plant owner to the one and only asset in Malaysia of thermal type coal-fired power plant, Chinese Group of Nuclear (CGN) through Malaysian local company EDRA Power Holdings Sdn Bhd has challenged Jimah power plant to increase its plant performance and reliability with significant reduction toward Unplanned Outage Rate (UOR) which currently has exceeded the target limit of 4%, two percent (2%) is higher than the limit as stipulated in Power Purchase Agreement (PPA). It is believed that key success factor in achieving this target is through the implementation a comprehensive scheduled maintenance program that can be realized with collaboration of functional organization lead by dedicated outage team known as Outage and Project Management (OPM). Originally, the plant backlog is managed by each functional area without any collaboration from other multidisciplinary which also could lead to the unresolved issue at plant. The main challenge in this research mainly in determining the best approach in managing plant backlog from multidisciplinary section with minimum intervention from outage team using a systematic system approach. The outcome should be a total clearance of outstanding defects and completing all planned job including preventive, predictive and condition based maintenance under Jimah maintenance strategy mainly to prolong the lifespan of asset for profitability until the end of PPA with Tenaga National Berhad (TNB) in year 2033. The development of scheduled outage management program is tailored through combination of world standard of quality management such as Total Quality Management (TQM), Reliability Centered Management (RCM), Total Production Maintenance (TPM) and many more. This research helps reveal the current plant condition and performance statistically through number of outstanding backlog and abnormalities registered in asset management system (MAXIMO), Operation’s logsheet, key performance indicator for every outages and etc. A complete work scheduling comprises all planned job for each type of outage shall be developed as the major outcome from this research. 2018-12 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/80965/1/FaizManizOthmanMSKA2018.pdf Othman, Faiz Maniza (2018) A study of best practice of scheduled outage program in increasing plant performance. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:124977
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Othman, Faiz Maniza
A study of best practice of scheduled outage program in increasing plant performance
description The purpose of this study is to determine solution in meeting high expectation from plant owner to the one and only asset in Malaysia of thermal type coal-fired power plant, Chinese Group of Nuclear (CGN) through Malaysian local company EDRA Power Holdings Sdn Bhd has challenged Jimah power plant to increase its plant performance and reliability with significant reduction toward Unplanned Outage Rate (UOR) which currently has exceeded the target limit of 4%, two percent (2%) is higher than the limit as stipulated in Power Purchase Agreement (PPA). It is believed that key success factor in achieving this target is through the implementation a comprehensive scheduled maintenance program that can be realized with collaboration of functional organization lead by dedicated outage team known as Outage and Project Management (OPM). Originally, the plant backlog is managed by each functional area without any collaboration from other multidisciplinary which also could lead to the unresolved issue at plant. The main challenge in this research mainly in determining the best approach in managing plant backlog from multidisciplinary section with minimum intervention from outage team using a systematic system approach. The outcome should be a total clearance of outstanding defects and completing all planned job including preventive, predictive and condition based maintenance under Jimah maintenance strategy mainly to prolong the lifespan of asset for profitability until the end of PPA with Tenaga National Berhad (TNB) in year 2033. The development of scheduled outage management program is tailored through combination of world standard of quality management such as Total Quality Management (TQM), Reliability Centered Management (RCM), Total Production Maintenance (TPM) and many more. This research helps reveal the current plant condition and performance statistically through number of outstanding backlog and abnormalities registered in asset management system (MAXIMO), Operation’s logsheet, key performance indicator for every outages and etc. A complete work scheduling comprises all planned job for each type of outage shall be developed as the major outcome from this research.
format Thesis
author Othman, Faiz Maniza
author_facet Othman, Faiz Maniza
author_sort Othman, Faiz Maniza
title A study of best practice of scheduled outage program in increasing plant performance
title_short A study of best practice of scheduled outage program in increasing plant performance
title_full A study of best practice of scheduled outage program in increasing plant performance
title_fullStr A study of best practice of scheduled outage program in increasing plant performance
title_full_unstemmed A study of best practice of scheduled outage program in increasing plant performance
title_sort study of best practice of scheduled outage program in increasing plant performance
publishDate 2018
url http://eprints.utm.my/id/eprint/80965/1/FaizManizOthmanMSKA2018.pdf
http://eprints.utm.my/id/eprint/80965/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:124977
_version_ 1643658569338322944
score 13.211869