Procurement methods in reducing disputes for construction projects

The success of any construction projects depends on the selection of the most appropriate procurement method. Proper evaluation of a procurement method towards dispute reduction in construction projects in Katsina State, is important. The selection of appropriate procurement method will ensure the s...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Aziz, Abdullahi
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/80843/1/AbdullahiAbdulAzizMFKA2014.pdf
http://eprints.utm.my/id/eprint/80843/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:81451
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.80843
record_format eprints
spelling my.utm.808432019-07-24T00:07:54Z http://eprints.utm.my/id/eprint/80843/ Procurement methods in reducing disputes for construction projects Abdul Aziz, Abdullahi TK Electrical engineering. Electronics Nuclear engineering The success of any construction projects depends on the selection of the most appropriate procurement method. Proper evaluation of a procurement method towards dispute reduction in construction projects in Katsina State, is important. The selection of appropriate procurement method will ensure the smooth running of the construction projects with less complications and disputes among the various parties involved. The aim of this study is to determine the appropriate procurement methods being use for reducing construction disputes in Katsina State of Nigeria. The objectives of the study are to evaluate the procurement methods used, to determine the causes of disputes in the procurement methods, to determine the dispute resolution mechanisms used in the procurement methods and to determine the most appropriate procurement method towards reduction of disputes in construction project in Katsina State Nigeria. The scope of study covers procurement methods used in Katsina state, Nigeria. The study includes projects in Government organizations (Public organizations) and private developers (Private organizations). This study is conducted through questionnaires survey. A total of 80 questionnaires were distributed to respondents comprising of engineers, clients and contractors. Sixty eight (68) questionnaires were returned duly answered. The data is analysed using SPSS and Average Index. From the study, it is found that the two types of procurement methods, Traditional, Design and Build are practiced in the study area. The result shows that Design and Build is frequently used in handling construction projects than the traditional method which is ‘Averagely’ used. From the study, the traditional procurement method frequently experiences disputes. The causes of disputes are poor communication, design errors, delay in payments, error in construction, excessive contract variations, multiple meaning of specification, difference in site condition, construction claims, difference in evaluations and public interruptions. The Alternate dispute resolution (ADR) consists of conciliation and mediation, was usually used in setting disputes without going to court, followed by Arbitration and litigation and the Design and Build procurement method is found to be the most appropriate in reducing construction disputes. 2014-01 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/80843/1/AbdullahiAbdulAzizMFKA2014.pdf Abdul Aziz, Abdullahi (2014) Procurement methods in reducing disputes for construction projects. Masters thesis, Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering. http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:81451
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Abdul Aziz, Abdullahi
Procurement methods in reducing disputes for construction projects
description The success of any construction projects depends on the selection of the most appropriate procurement method. Proper evaluation of a procurement method towards dispute reduction in construction projects in Katsina State, is important. The selection of appropriate procurement method will ensure the smooth running of the construction projects with less complications and disputes among the various parties involved. The aim of this study is to determine the appropriate procurement methods being use for reducing construction disputes in Katsina State of Nigeria. The objectives of the study are to evaluate the procurement methods used, to determine the causes of disputes in the procurement methods, to determine the dispute resolution mechanisms used in the procurement methods and to determine the most appropriate procurement method towards reduction of disputes in construction project in Katsina State Nigeria. The scope of study covers procurement methods used in Katsina state, Nigeria. The study includes projects in Government organizations (Public organizations) and private developers (Private organizations). This study is conducted through questionnaires survey. A total of 80 questionnaires were distributed to respondents comprising of engineers, clients and contractors. Sixty eight (68) questionnaires were returned duly answered. The data is analysed using SPSS and Average Index. From the study, it is found that the two types of procurement methods, Traditional, Design and Build are practiced in the study area. The result shows that Design and Build is frequently used in handling construction projects than the traditional method which is ‘Averagely’ used. From the study, the traditional procurement method frequently experiences disputes. The causes of disputes are poor communication, design errors, delay in payments, error in construction, excessive contract variations, multiple meaning of specification, difference in site condition, construction claims, difference in evaluations and public interruptions. The Alternate dispute resolution (ADR) consists of conciliation and mediation, was usually used in setting disputes without going to court, followed by Arbitration and litigation and the Design and Build procurement method is found to be the most appropriate in reducing construction disputes.
format Thesis
author Abdul Aziz, Abdullahi
author_facet Abdul Aziz, Abdullahi
author_sort Abdul Aziz, Abdullahi
title Procurement methods in reducing disputes for construction projects
title_short Procurement methods in reducing disputes for construction projects
title_full Procurement methods in reducing disputes for construction projects
title_fullStr Procurement methods in reducing disputes for construction projects
title_full_unstemmed Procurement methods in reducing disputes for construction projects
title_sort procurement methods in reducing disputes for construction projects
publishDate 2014
url http://eprints.utm.my/id/eprint/80843/1/AbdullahiAbdulAzizMFKA2014.pdf
http://eprints.utm.my/id/eprint/80843/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:81451
_version_ 1643658533373214720
score 13.18916