A framework for combating payment-related issues (PRI) in the Malaysian construction industry
Payment problems in the Malaysian construction industry are sensitive issues in nature and have relatively increased in number in recent years. In the Malaysian context, there are a number of research’s which have investigated on the causes of payment related disputes and it can be comprehended that...
Saved in:
Main Authors: | Judi, Siti Suhana, Mustaffa, Nuremma, Nayan, Roselan |
---|---|
Format: | Article |
Published: |
Journal of Built Environment, Technology and Engineering (JBETE)
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/80616/ http://www.jbete.com/wp-content/uploads/2017/05/JBETE2_74.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Judicial decisions in setting aside adjudication determination under the Singaporean building and construction industry security of payment act
by: Tee, Zhi Lun
Published: (2021) -
Validity issues of variation order in construction contracts
by: Mazahar, Norazilan
Published: (2019) -
Framework development of bills of quantities accuracy in construction organisation
by: Bandi, Shamsulhadi
Published: (2015) -
Towards a framework of automated resource model for post contract cost control of construction projects
by: Igwe, Uchenna Sampson, et al.
Published: (2020) -
BIM educational framework for the quantity surveying students: the Malaysian perspective
by: Ali, Kherun Nita, et al.
Published: (2015)