Valuation of interim payment: issues encountered by the parties involved in relation to interim payment

Improper valuation of interim payment may be a source of dispute. The Quantity Surveyor as a professional person in performing the task is expected to possess a required level of competency and accepted by the construction industry in performing it. Thus, can the valuation of interim payment be cons...

Full description

Saved in:
Bibliographic Details
Main Authors: Nayan, Roselan, Mustaffa, Nur Emma, Judi, Siti Suhana
Format: Article
Published: Journal of Built Environment, Technology and Engineering (JBETE) 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/80615/
http://www.jbete.com/wp-content/uploads/2017/05/JBETE2_77.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.80615
record_format eprints
spelling my.utm.806152019-06-27T06:10:14Z http://eprints.utm.my/id/eprint/80615/ Valuation of interim payment: issues encountered by the parties involved in relation to interim payment Nayan, Roselan Mustaffa, Nur Emma Judi, Siti Suhana TH Building construction Improper valuation of interim payment may be a source of dispute. The Quantity Surveyor as a professional person in performing the task is expected to possess a required level of competency and accepted by the construction industry in performing it. Thus, can the valuation of interim payment be considered reliable in avoiding dispute and what are the common problems faced by a Quantity Surveyor in meeting the expectation of the employer or client. The issue at hand is therefore mainly related to credibility or level of competency and professionalism of a Quantity Surveyor in performing this task. The objective of this study is to investigate on the current issues by the relevant parties involved in relation to interim payment, which include the level of satisfaction of the contractor and employer on the task performed by the registered Quantity Surveyors. The scope of this research is confined to the Quantity Surveyors Act 1967 and primarily focusing on contractors and employers involved in the valuation of interim payment. Part of the research process adopted in this research is a preliminary survey conducted that include the process of identifying and short listing the problems encountered by the relevant parties namely employer, contractors and consultants who have actual experiences in the process. This paper therefore will establish the issues and problems faced by these parties in the valuation process. Journal of Built Environment, Technology and Engineering (JBETE) 2017 Article PeerReviewed Nayan, Roselan and Mustaffa, Nur Emma and Judi, Siti Suhana (2017) Valuation of interim payment: issues encountered by the parties involved in relation to interim payment. Journal of Built Environment, Technology and Engineering, 2 . pp. 133-141. ISSN 0128-1003 http://www.jbete.com/wp-content/uploads/2017/05/JBETE2_77.pdf
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
topic TH Building construction
spellingShingle TH Building construction
Nayan, Roselan
Mustaffa, Nur Emma
Judi, Siti Suhana
Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
description Improper valuation of interim payment may be a source of dispute. The Quantity Surveyor as a professional person in performing the task is expected to possess a required level of competency and accepted by the construction industry in performing it. Thus, can the valuation of interim payment be considered reliable in avoiding dispute and what are the common problems faced by a Quantity Surveyor in meeting the expectation of the employer or client. The issue at hand is therefore mainly related to credibility or level of competency and professionalism of a Quantity Surveyor in performing this task. The objective of this study is to investigate on the current issues by the relevant parties involved in relation to interim payment, which include the level of satisfaction of the contractor and employer on the task performed by the registered Quantity Surveyors. The scope of this research is confined to the Quantity Surveyors Act 1967 and primarily focusing on contractors and employers involved in the valuation of interim payment. Part of the research process adopted in this research is a preliminary survey conducted that include the process of identifying and short listing the problems encountered by the relevant parties namely employer, contractors and consultants who have actual experiences in the process. This paper therefore will establish the issues and problems faced by these parties in the valuation process.
format Article
author Nayan, Roselan
Mustaffa, Nur Emma
Judi, Siti Suhana
author_facet Nayan, Roselan
Mustaffa, Nur Emma
Judi, Siti Suhana
author_sort Nayan, Roselan
title Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
title_short Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
title_full Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
title_fullStr Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
title_full_unstemmed Valuation of interim payment: issues encountered by the parties involved in relation to interim payment
title_sort valuation of interim payment: issues encountered by the parties involved in relation to interim payment
publisher Journal of Built Environment, Technology and Engineering (JBETE)
publishDate 2017
url http://eprints.utm.my/id/eprint/80615/
http://www.jbete.com/wp-content/uploads/2017/05/JBETE2_77.pdf
_version_ 1643658465247232000
score 13.18916