Variation in the standard from of contract in Malaysia and Indonesia

Variation orders is one of the main causes of disputes in Indonesia’s construction industry. The disputes become more complicated when such orders occur in the lump sum contracts where the contractor is contractually obliged to carry out the work according to the design at the specified sum. It appe...

Full description

Saved in:
Bibliographic Details
Main Author: Rahmatyo, Bayu Dwi
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/79260/1/BayuDwiRahmatyoMFAB2015.pdf
http://eprints.utm.my/id/eprint/79260/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.79260
record_format eprints
spelling my.utm.792602018-10-14T08:39:57Z http://eprints.utm.my/id/eprint/79260/ Variation in the standard from of contract in Malaysia and Indonesia Rahmatyo, Bayu Dwi HT101-395 Sociology, Urban Variation orders is one of the main causes of disputes in Indonesia’s construction industry. The disputes become more complicated when such orders occur in the lump sum contracts where the contractor is contractually obliged to carry out the work according to the design at the specified sum. It appears that, unlike the Indonesian’s Permen PU contract, the Malaysian Public Work Department’s standard form of contract contains clearer variation order provision. The objective of this research is to make a comparison between the variation terms in Malaysia’s, the PWD 203 (1/2010) lump sum contract and Indonesia’s Permen PU No. 07/PRT/M/2011 Book 2A contract. It is hoped that the findings of this research may help to improve the Permen PU’s standard form. The comparison is made based issues that arise in case law in Malaysia which are collected from the online database provided by Lexis Malaysia. From the further careful analysis of the cases, four main issues are identified, those are: one, whether or not there is a variation clause in the contract; two, whether the variation order is within the scope of variation clause; three, whether the variation order is issued according to the procedure set out in the contract; and four, whether the method of the valuation of the variation work used by the employer is the correct method. Based on those issues, the analysis found that there are similarities in the express variation order clauses in both standard forms, mainly they define the scope of work in the contract. However, while in Malaysia the procedures and the methods of valuation are clearly stated in the clauses of PWD Form 203 (Rev 1/2010), in Indonesia they are governed by regulation and not stipulated in the clauses of Permen PU No. 07/PRT/M/2011. 2015 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/79260/1/BayuDwiRahmatyoMFAB2015.pdf Rahmatyo, Bayu Dwi (2015) Variation in the standard from of contract in Malaysia and Indonesia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic HT101-395 Sociology, Urban
spellingShingle HT101-395 Sociology, Urban
Rahmatyo, Bayu Dwi
Variation in the standard from of contract in Malaysia and Indonesia
description Variation orders is one of the main causes of disputes in Indonesia’s construction industry. The disputes become more complicated when such orders occur in the lump sum contracts where the contractor is contractually obliged to carry out the work according to the design at the specified sum. It appears that, unlike the Indonesian’s Permen PU contract, the Malaysian Public Work Department’s standard form of contract contains clearer variation order provision. The objective of this research is to make a comparison between the variation terms in Malaysia’s, the PWD 203 (1/2010) lump sum contract and Indonesia’s Permen PU No. 07/PRT/M/2011 Book 2A contract. It is hoped that the findings of this research may help to improve the Permen PU’s standard form. The comparison is made based issues that arise in case law in Malaysia which are collected from the online database provided by Lexis Malaysia. From the further careful analysis of the cases, four main issues are identified, those are: one, whether or not there is a variation clause in the contract; two, whether the variation order is within the scope of variation clause; three, whether the variation order is issued according to the procedure set out in the contract; and four, whether the method of the valuation of the variation work used by the employer is the correct method. Based on those issues, the analysis found that there are similarities in the express variation order clauses in both standard forms, mainly they define the scope of work in the contract. However, while in Malaysia the procedures and the methods of valuation are clearly stated in the clauses of PWD Form 203 (Rev 1/2010), in Indonesia they are governed by regulation and not stipulated in the clauses of Permen PU No. 07/PRT/M/2011.
format Thesis
author Rahmatyo, Bayu Dwi
author_facet Rahmatyo, Bayu Dwi
author_sort Rahmatyo, Bayu Dwi
title Variation in the standard from of contract in Malaysia and Indonesia
title_short Variation in the standard from of contract in Malaysia and Indonesia
title_full Variation in the standard from of contract in Malaysia and Indonesia
title_fullStr Variation in the standard from of contract in Malaysia and Indonesia
title_full_unstemmed Variation in the standard from of contract in Malaysia and Indonesia
title_sort variation in the standard from of contract in malaysia and indonesia
publishDate 2015
url http://eprints.utm.my/id/eprint/79260/1/BayuDwiRahmatyoMFAB2015.pdf
http://eprints.utm.my/id/eprint/79260/
_version_ 1643658144065257472
score 13.209306